5.
ASSEMBLY AND DISASSEMBLY INSTRUCTIONS
Below is the description of the procedure for assembling and disassembling the "Mobile Access
Platform type Alulift " produced by Lockhard Sp. z o.o.
Assembly, disassembly, operation and maintenance of the PRP may only be performed by properly
trained personnel, who must read and fully understand the following procedures and descriptions
before attempting to assemble or disassemble.
Two persons are required for assembly and disassembly. The area of the PRP assembly and
operation must be protected against unauthorized access by third parties.
Pre-assembly works
Before you begin the PRP assembly, check all the elements and components listed in
Table No. 2, which are necessary for its proper operation,
For assembly, use only undamaged and original manufacturer's parts.
Before commencing the PRP type Alulift assembly, check the surrounding area for safety, e.g. if there
are no electrical installations, ruins, rubble, excavations, mobile cranes, pedestrian traffic, any
vehicle or machine traffic, etc. in the area.
If there is a risk of coming into contact with overhead electrical power lines, these lines should be
shut off.
Electrical power lines which are in the distance of the level of free-swinging extreme cables from the
furthest possible outer edge of the transferred elements at the time of PRP operation, assembly and
disassembly do not require being shut off, with the said distance being not closer than:
2 m for a low voltage line of 400V
5 m for a line of up to 15 kV
10 m for a line of up to 30 kV
15 m for a line of over 30 kV
You should check the ground on which PRP will be installed. The ground must be horizontal and
hardened.