LightLink-CXL – Service Manual
Rev. No. : 01
Page
23
of
98
-
Connect the all the LCD cabling
Note: LCD power cable needs to be push up before securing the screw and 9 pins
connector needs to be connected at COM Port
Figure 4.9 LCD cable connecting process
-
Release the pressurized button to lift up height
Note: By doing this process will allow the arm ass’y and base wheel ass’y are closer
and easily to slide in the arm ass’y
Figure 4.10 Elevation Process
Pressurized button
Содержание LightLink-CXL
Страница 1: ...Service Manual LightLink CXL Corneal Cross Linking System ...
Страница 90: ...LightLink CXL Service Manual Rev No 01 Page 89 of 98 ...
Страница 91: ...LightLink CXL Service Manual Rev No 01 Page 90 of 98 ...
Страница 93: ...LightLink CXL Service Manual Rev No 01 Page 92 of 98 ...
Страница 97: ...LightLink CXL Service Manual Rev No 01 Page 96 of 98 Finish this process we will get PASS ...
Страница 99: ...LightLink CXL Service Manual Rev No 01 Page 98 of 98 ...