15
2 - INSTALLATION
2.1 YARN ACCUMULATOR INSTALLATION
N.B.: Yarn accumulators that are moved from warehouse storage into
a warmer weaving mill environment may develop condensation; please
wait until they are completely dry before connecting them up.
Failure to do so may damage the electronic components.
For installation of the yarn accumulator onto the machine, proceed as follows:
FLAT CABLE VERSION
1. Place the flat cable onto the support ring and fix it by means of straps.
The text “LGL Electronics” on the cable must be on the right reading
side; the flat cable lip shall be turned downwards.
"A"
"A"
5 - CANH / LSA
4 - CANL / LSB
3 - STOP Signal
2 - Positive Power supply
1 - Power supply voltage 0V
Keep flat cable with top
portion facing ring profile.
N.B.: The support ring shall be sized as follows:
- height not less than 25mm
- max. thickness 10 mm
BLUE
BROWN
BLACK
RED
YELLOW/GREEN
SECTION "A-A"
Содержание SPIN1
Страница 2: ......
Страница 6: ......
Страница 13: ...13 1 GENERAL FEATURES 1 5 OVERALL DIMENSIONS 40 140 60 65 50 77 5 73 5 50 Weight 350 g...