Installation
Installation Manual
25
ENGLISH
Cut the pipes and the cable
- Use the accessory piping kit or the pipes pur-
chased locally.
- Measure the distance between the indoor
and the outdoor unit.
- Cut the pipes a little longer than measured distance.
- Cut the cable 1.5m longer than the pipe length.
Burrs removal
- Completely remove all burrs from the cut
cross section of pipe/tube.
- Put the end of the copper tube/pipe to down-
ward direction as you remove burrs in order
to avoid to let burrs drop in the tubing.
Flaring work
- Carry out flaring work using flaring tool as
shown right.
Firmly hold copper tube in a bar(or die) as indi-
cated dimension in the table above.
Pipe welding
- Insert and weld the pipe.
- Always make sure to flow Nitrogen at
0.2kgf/cm
2
within the pipe when welding.
- If the welding is done without flowing Nitrogen,
it can generate a thick oxidized coating within
the pipe to interfere with normal operation of
valve and compressor etc.
Insulation
- Use rubber foamed insulation material
(EPDM, NBR) with high thermal resistance.
- When installed in humid environment, use
thicker insulation material than usual.
- Insert the insulation material within the prod-
uct as deep as possible.
h
The thickness of the above insulation material is
based on thermal conduction rate of 0.036W/m°C.
Pipe
Reamer
Point down
Nitrogen
Copper
tube
90°
Slanted Uneven Rough
Nitrogen
Nitrogen
Panel
Inside product
Insulation
Copper
tube
Copper tube
Direction of Nitrogen
Regulator
Taping
Valve
Nitrogen
Nitrogen
Nitrogen
Refrigerant Piping
CAUTION
There is no pump-down function because Indoor is the only heating unit. After vacuum drying, recharge the refrigerant.
Unit : mm(inch)
Pipe
“A”
Gas
Liquid
Gas
Liquid
15.88(5/8)
9.52(3/8)
1.6~1.8
(0.63~0.71)
1.5~1.7
(0.59~0.67)
Bar
Copper pipe
Clamp handle
Red arrow mark
Cone
Yoke
Handle
Bar
"A"
Classification
Thickness
Liquid pipe(Ø9.52)
t9 or above
Gas pipe(Ø22.2)
t19 or above