Due to our policy of continuous product innovation, some specifications may change without notification. ©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
3. Preparation Checklist
Content
Check
Is there any damage?
Yes
No
Are the bolts / nuts assembled properly and firmly attached?
Yes
No
Does the power specification match the product specification?
Yes
No
Is the wiring installed accurately?
Yes
No
Is the product installed correctly?
Yes
No
Are the protective devices of the electric circuit installed correctly in accordance with specifications
and codes?
Yes
No
Are all the terminal blocks connected properly?
Yes
No
Are all control plugs connected properly and seated at the terminal boards?
Yes
No
4. Check Water System
Content
Check
Are all valves connected to the chiller open?
Yes
No
Are all pipes connected accurately?
Yes
No
Are there any clogs in the drain pipe?
Yes
No
Are there any leaks?
Yes
No
Is the air within the system completely well discharged?
Yes
No
Is the water pump operating properly?
Yes
No
Confirm UI6-G has a closed contact during pump operation
(must be external signal).
Yes
No
Is the water flow switch operating?
Yes
No
Is the strainer installed on the piping to the evaporator?
Yes
No
Checklist for Chiller Installation, Page 1 of 2