Page 6
Installation
Installation Checklist
Install the cabinets by following these simple steps:
Step 1:
Unpack the system
Step 2:
Report any damage to the freight carrier
Step 3:
If appropriate, remove any covers and/or doors
Step 4:
If appropriate, remove the mounting plate
assembly and store where damage will not
occur to the electronics
Step 5:
Attach the cabinet to the wall (reference stickers
inside the cabinet for proper orientation if it is
in question)
Step 6:
Drill conduit entry holes if KO’s are not provided
and attach conduit where appropriate
Step 7:
Pull all wire into the cabinet
Step 8:
Test & Verify all wiring by directly connecting line
to load - Correct any faults and re-test wiring
prior to proceeding
Step 9:
Re-install any control electronics removed in step
#4
Step 10:
Terminate the feed & load wiring to each relay
Step 11:
Terminate control wiring
Step 12:
Verify feed wiring
Step 13:
Verify load wiring
Step 14:
Verify master/slave network wiring
Step 15:
Blow out dust, dirt, or debris which has
accumulated in the cabinet
Step 16:
Apply power to the system
Step 17:
Verify proper operation of each relay using the
override buttons
Step 18:
Make adjustments to remote slave starting relay
number if necessary and reset the system
WEB
VERSION
Содержание Z-MAX r24sd
Страница 2: ...WEB VERSION...
Страница 6: ...Table of Contents Page vi WEB VERSION...
Страница 14: ...Page 8 WEB VERSION...
Страница 56: ...Page 50 WEB VERSION...
Страница 62: ...Page 56 WEB VERSION...
Страница 66: ...Page 60 WEB VERSION...
Страница 72: ...Page 66 WEB VERSION...
Страница 90: ...Page 84 WEB VERSION...
Страница 92: ...WEB VERSION...