64
NE1032T Installation Guide
To
replace
a
hot
‐
swap
power
supply
module,
complete
the
following
steps:
1.
Select
an
empty
power
supply
module
bay
on
the
rear
of
the
switch.
If
the
target
bay
is
protected
by
a
blank
power
filler
plate,
remove
the
blank.
2.
Insert
the
power
supply
module
into
the
selected
power
‐
supply
bay
and
gently
push
it
into
the
slot
until
it
latches.
Each
power
supply
module
has
a
mechanical
guide
key
to
prevent
you
from
inserting
the
module
incorrectly.
3.
Connect
the
power
cord
to
the
power
supply
module
and
to
an
appropriate
universal
grounded
AC
power
source.
4.
Make
sure
that
the
power
supply
module’s
LEDs
are
green.
Содержание ThinkSystem NE1032T
Страница 1: ...Lenovo ThinkSystem NE1032T RackSwitch Installation Guide For Lenovo Cloud Network OS ...
Страница 6: ...6 Lenovo G8296 Installation Guide ...
Страница 14: ...14 NE1032T Installation Guide ...
Страница 18: ...18 NE1032T Installation Guide ...
Страница 19: ... Copyright Lenovo 2017 19 Chapter 2 Switch Components This chapter describes the NE1032T hardware components ...
Страница 32: ...32 NE1032T Installation Guide ...
Страница 78: ...78 NE1032T Installation Guide ...
Страница 94: ...94 NE1032T Installation Guide ...
Страница 100: ...100 NE1032T Installation Guide ...
Страница 120: ...120 NE1032T Installation Guide ...