52
NE1032T Installation Guide
3.
Secure
the
air
‐
duct
mounting
bracket
to
the
rails
with
M6
screws.
Torque
the
screws
to
approximately
5.7
Nm
±
0.1
Nm
(50
inch
‐
pounds).
Note:
Reuse
the
original
M6
screws
used
to
fasten
the
4
‐
post
rack
mounting
brackets
to
secure
the
air
duct
mounting
brackets
with
4
‐
post
mounting
brackets
together.
4.
Secure
the
air
‐
duct
mounting
bracket
to
the
rack
chassis
with
M3.5
screws.
Torque
the
screws
to
approximately
1.1
Nm
±
0.1
Nm
(10
inch
‐
pounds).
5.
Plug
the
power
cords
into
their
respective
NE1032T
power
connectors
and
using
tie
wraps,
secure
the
power
cords
to
the
mounting
rails.
M3.5 screws
Air duct mounting bracket
M6 screws
Tie wraps
Tie wraps
Power connection
Power connection
Содержание ThinkSystem NE1032T
Страница 1: ...Lenovo ThinkSystem NE1032T RackSwitch Installation Guide For Lenovo Cloud Network OS ...
Страница 6: ...6 Lenovo G8296 Installation Guide ...
Страница 14: ...14 NE1032T Installation Guide ...
Страница 18: ...18 NE1032T Installation Guide ...
Страница 19: ... Copyright Lenovo 2017 19 Chapter 2 Switch Components This chapter describes the NE1032T hardware components ...
Страница 32: ...32 NE1032T Installation Guide ...
Страница 78: ...78 NE1032T Installation Guide ...
Страница 94: ...94 NE1032T Installation Guide ...
Страница 100: ...100 NE1032T Installation Guide ...
Страница 120: ...120 NE1032T Installation Guide ...