IOM / Rooftop Smart and Linéa™ Range - Page 113
PLANNED MAINTENANCE
PLANNED MAINTENANCE
PLANNED MAINTENANCE
PLANNED MAINTENANCE
PLANNED MAINTENANCE
REFRIGERATION CIRCUITS
At least once a year, carry out an in-depth inspection of the
refrigerant circuits.
In addition, before each season (or every 3 months if used
permanently) the tasks listed in the maintenance contract
must be performed, i.e. check the refrigerant change,
evaporation and condensing temperatures etc...
This work must be carried out by a trained refrigeration
engineer. We shall therefore keep the details of the work
and the type of checks to be performed to a minimum.
IN ACCORDANCE WITH THE LAW
REFRIGERATION FLUIDS MUST BE COLLECTED.
DEGASSING INTO THE ATMOSPHERE IS FORBIDDEN.
MAINTENANCE SCHEDULE
NOTE :
It is recommended that maintenance is performed when
changing from the heating to the cooling season and vice-
versa, for example every 6 months.
After
2
3
6
Annually
50 hours
months
months
months
Fan motor assembly
X (1)
Gas burner
X
Terminal unit
X
Air-conditioning only
Filters and internal battery
X
External battery
X
Hot water battery
X
Condensate tray
X
Refrigerant system
X
Permanent operation
Filters and internal battery
X
External battery
X
Condensate tray
X
Refrigerant system
X
(1) : If new belts fitted