
mc²96 Installation & Service Guide
Version: 1.0/3
48/65
5. Service Procedures
8.
Once everything is secured, plug the bridging power connector from each user panel into the main
control board (as shown below):
9.
Fit the Central Panel Upper back into the console frame, apply mains power and then
the
Bayserver (to refresh the communication). Then test the user panel's functionality.