Glossary UH50 – FOR INTERNAL USE ONLY!
Gyr GmbH
Glossary UH606-101b
Page
11
of
38
Service loop 2 (“LOOP 2”)
Head of the loop
Max. flowrate,
at 2s intervals with date stamp (37)
Max. power,
at 2s intervals with date stamp (38)
Max. temperatures,
at 2s intervals with date stamp (39)
for flow and return maximum
Measuring period for maximum calculation (24)
Service loop 3 (“LOOP 3”)
Head of the loop
Set day for December 2005 (35)
Set day for November 2005 (--)
... ...
Set day for July 2004 (--)
using LCD button 2:
Quantity of heat on the set day (36)
Tariff register 1 on the set day (69)
Volume on the set day (64)
Max. flowrate on the set day,
at 2s intervals with date stamp (66)
Max. heat power on the set day,
at 2s intervals with date stamp (67)
Max. temperatures on the set day,
at 2s intervals with date stamp (46)
for flow and return maximum
Missing time count on the set day (65)
These lines repeat for all earlier months.
LCD button 1 (LOOP) can be used to jump directly to the next month back.
Service loop 4 (“LOOP 4”)
Head of the loop
Current tariff,
at 2s intervals with threshold value 1 (68)
Measuring interval for flowrate (98)
Measuring interval for temperature (33)
Module 1 not fitted (29)
Module 1: Analog module
Module 1: CL module
Module 1: M-bus module
M-bus primary address 1 *) (21)
M-bus secondary address 8-digit *) (22)
Modul1: Multi module
Modul1: Pulse module; channel 1 = tariff register 2 **)
Modul1: Pulse module; channel 1 = quantity of heat **)
Module 1:Pulse module; channel 2 = tariff register 1 **)
Module 1: Pulse module; channel 2 = volume **)
Module 1: Pulse module; channel 2 = status display **)
Module 2: not fitted (92)
Module 2: Analog module
Module 2: CL module
Module 2: M-bus module