These chapters in the manual are to be used by qualified, authorized technical staff.
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-leveling device is working properly.
•
The expansion valves are working properly
6. Installation Check-up
WARNING
: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
GROUPS
•
Hook up the filter holders to the groups (without coffee).
•
Let each group dispense water for about a minute.
HOT WATER
•
Continuously dispense hot water (pressing the appropriate button) until at least 5 liters of water have been used for a machine
with 2 - 3 groups (see the “Cleaning and Maintenance” Chapter in the User’s Manual).
STEAM
•
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
WARNING
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING TO THE
INSTRUCTIONS BELOW:
English
English
36 EN
Содержание M39 GT HD Dosatron
Страница 2: ......
Страница 3: ...I ...
Страница 6: ...4 ...
Страница 9: ...7 ...
Страница 32: ...Italiano Italiano 30 IT ...
Страница 54: ...English English 52 EN ...
Страница 76: ...Français Français 74 FR ...
Страница 98: ...96 DE Deutsch Deutsch ...
Страница 120: ...Español Español 118 ES ...
Страница 142: ...Portugûes Portugûes 140 PT ...
Страница 145: ......
Страница 147: ......