Kyland Telecom
-28-
Figure 4-6 Fiber port connection
4
.
After accomplishing the connection, please check the LNK/ACT indicator on the
front panel for the corresponding optical port. If the indicator is on, this means
the connection is effective.
4.5 Cable wiring
Cable wiring should meet the following requirements:
1
.
Before cable wiring, check whether the specifications, models and quantities of
all cables comply with the construction drawing design and contract
requirements.
2
.
Before cable wiring, it is necessary to check whether there is damaged cable and
whether the cables are accompanied by ex-factory records and vouchers attesting
their quality such as quality assurance certificate etc.
3
.
The specifications, quantities, route directions and laying position of the cables
to be laid should meet the design requirements of construction drawings. The
Содержание KIEN6000
Страница 1: ...KIEN6000 Industrial Ethernet Switch User s Manual KYLAND Telecom Technology Co Ltd...
Страница 26: ...Kyland Telecom 20 Figure 3 8 Grounding method for KIEN6000 case...
Страница 44: ...Kyland Telecom 38 Figure A 3 Cable sequence of cross over cable...
Страница 47: ...Kyland Telecom 41...