ASSEMBLY INSTRUCTIONS
10
A
Remove the original tube stays fixing the four loader
tubes, and fix the six tubes together using the tube
stays in the kit.
3. Fix the tubes with nuts and cover the end with metal
caps.
A
Wrap seal tape around male thread before installing
the caps.
4. Install the right boom cylinder.
5. Connect the hydraulic hoses (9/16 UNF) to tubes.
C
Hose guide
1. Install the hose guide on side frame RH as shown.
C
3rd Function Valve section
1. Install 3rd function coupler stay to Main Frame (RH) as
shown the chart below.
(1) Hydraulic tube 1 (Black)
(2) Hydraulic tube 2 (Green)
(3) 2-M6 x 25 bolts with washers
(4) 2-Tube stays
(1) 2-Nuts (3/4 UNF)
(2) 2-Caps (3/8 NPTF)
(1) Hose guide
(2) M16 x 30 bolt
(3) M16 nut
Combination
(Figure)
A
B
C
D
Kit
3rd
function
ON
ON
ON
ON
MSL
ON
ON
Swift-tach
ON
ON
Bolt length for
3rd Valve stay
40 mm
45 mm
45 mm
45 mm
Direction of bolt
In to Out Out to In Out to In Out to In
(1) 2-M10 x 40 bolts
(2) 2-M10 nylon lock nuts
Содержание LA535
Страница 2: ......
Страница 4: ...CONTENTS TIGHTENING TORQUE OF ADAPTORS ELBOWS AND OTHERS 47 ...