5 Installation at Site
30 of 126
Amacan K
1579.807/07-EN
7
8
9
Fig. 13:
Securing the control and power cables
10. Secure the control cable (7) and power cables (8) to the crane hook (3) of the
lifting equipment with a manila rope (9).
11. Trim the spacer (a) to fit between the two ferrules.
a
b
c
d
e
f
Fig. 14:
Cross-section of the cable guide
12. Insert the support rope (f) and the control cable (c) into the spacer (a) and make
sure that they are in their respective ducts.
13. Tighten the cables with the manila rope running over the crane hook.
14. Insert the power cables (b) into the hollows of the spacer (a) and, starting from
the bottom, firmly clamp the power cables with cable clamps (d) covered by a
plastic sheath (e).
15. In the area of the lifting lug between the rope sections, lay all cables in loops
and fasten them to the rope section above.
16. Progressively lower the pump set into the discharge tube while securing the
cable bundle with evenly spaced sheathed cable clamps.
17. Fit a heat shrink tube on any protruding sharp-edged rope ends (e.g. at the
ferrule) to prevent any damage to the power and control cables.
Содержание Amacan K
Страница 124: ......
Страница 125: ......
Страница 126: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 1579 807 07 EN 01117570...