
A - 1
Appendix
A1 Commissioning
A1.1 Preparing for Commissioning
Due to transport considerations, the PTO shaft and bale ejector (Special Equipment) do not come attached to the
round baler at delivery. The round baler needs to be fully assembled prior to commissioning and adjusted to the
type of tractor used.
The following parts are packed separately at delivery. The words in parentheses indicate) the storage location
on the machine during transport.
1 bale ejector
(pallet)
2 Spacer (Vario Pack 1810)
(twine box)
3 small parts
(twine box)
4 linkage
(pick-up)
5 U-bracket
(twine box)
7 springs
(pick-up)
8 springs with clamp bolts
(twine box)
9 rail
(twine box)
10 clamping sleeve
(twine box)
11 nuts
(twine box)
12 safety foil
(twine box)
13 spray paint can
(twine box)
14 PTO shaft
(bale chamber)
15 PTO sahft support bracket
(twine box)
16 hose and cable retainer
(bale chamber)
18 fasteners
(twine box)
20 PTO shaft holder
(twine box)
RP300086
2
5
Содержание Vario Pack 1510
Страница 1: ...Operating manual No 766 2 GB Round Baler Vario Pack 1510 Vario Pack 1810 from machine no 541 290 ...
Страница 8: ...I 4 General Information ...
Страница 20: ...II 12 Safety ...
Страница 75: ...VIII 17 Maintenance 942 357 1 8 10 2 Lubrication Points on the Round Baler right hand side ...
Страница 76: ...VIII 18 Maintenance 9 942 356 2 95 8 10 3 Lubrication Points on the Round Baler left hand side ...
Страница 78: ...IX 2 Winter Storage ...
Страница 98: ...A 14 Appendix ...
Страница 99: ...A 15 Appendix ...