
VIII - 14
Maintenance
8.9.2 Shortening the front floor conveyor
chain
If the chain tensioning lever is in Position “b”, the roller
chain must be shortened as described above.
The chain tensioning lever must be in Position “a” after
the roller chain has been shortened.
To shorten the chain (1) a rail (2) is detached as follows.
•
Remove the wire pins (1) on both sides.
•
Detach the rail (2).
•
Remove two chain links (3).
•
Connect the roller chain with a chain-connect link.
KRS-1-201
1
2
2
1
3
KRS-1-202
1
a
b
Содержание Vario Pack 1510
Страница 1: ...Operating manual No 766 2 GB Round Baler Vario Pack 1510 Vario Pack 1810 from machine no 541 290 ...
Страница 8: ...I 4 General Information ...
Страница 20: ...II 12 Safety ...
Страница 75: ...VIII 17 Maintenance 942 357 1 8 10 2 Lubrication Points on the Round Baler right hand side ...
Страница 76: ...VIII 18 Maintenance 9 942 356 2 95 8 10 3 Lubrication Points on the Round Baler left hand side ...
Страница 78: ...IX 2 Winter Storage ...
Страница 98: ...A 14 Appendix ...
Страница 99: ...A 15 Appendix ...