
V - 9
Basic Settings and Operation
KR-1-007
3
1
2
•
Thread the twine from the eyelets (1) through the
twine retainers (2).
•
Thread the twine (1) through the twine brake (4)
eyelets (3).
•
Thread the twine through the space between the
spring tensioners (2) and the screws (5).
For twine wrapping, the net stretcher bar
(2) - if a net wrap system is installed - is
rotated into the upper position.
The connecting link inside the guide rod (1) holds the net
stretcher bar (2) in position.
•
Open the twine cleaning flaps (1).
•
Rotate the twine manually at the stepped roller in the
working direction (see arrow).
•
Remove dirt in area (2).
•
Shut the cleaning flaps (1).
•
Rotate the stepped roller in the direction of the arrow
until the twine holders (3) move from the outside to the
centre starting position.
The twine holders (3) must move to the centre when the
stepped roller is rotated. Otherwise continue to rotate the
stepped roller in the direction of the arrow until the
starting position (see illustration) has been reached.
RBV04040
2
1
CP400001
4
1
3
2
2
5
2
1
CP400002
Содержание Vario Pack 1510
Страница 1: ...Operating manual No 766 2 GB Round Baler Vario Pack 1510 Vario Pack 1810 from machine no 541 290 ...
Страница 8: ...I 4 General Information ...
Страница 20: ...II 12 Safety ...
Страница 75: ...VIII 17 Maintenance 942 357 1 8 10 2 Lubrication Points on the Round Baler right hand side ...
Страница 76: ...VIII 18 Maintenance 9 942 356 2 95 8 10 3 Lubrication Points on the Round Baler left hand side ...
Страница 78: ...IX 2 Winter Storage ...
Страница 98: ...A 14 Appendix ...
Страница 99: ...A 15 Appendix ...