Part 2: Overview of display values and settings
Expert
area
41
Installation (only for cascades or two-stage
operation)
Designation Value
range Default IV
SEQ SW TIME
10 - 800 hours
200 hours
BLOCK-TIME
00 min – 30 min
00 min
HYST BURNER2 2K – 20K
2 K
Cooling function
HS COOL-FCT
00-01
00
T-HS COOL
30°C - 120°C
95°C
See following pages for continuation
SEQ SW TIME
(time to sequence change)
For operation with at least 2 heat generators there is the
option to swap the boiler sequence after the operating
hours specified here of the first heat generator of the active
sequence.
BLOCK-TIME
(delay time for next stage)
Min. delay time after switching on or with switching HS,
also when switching a layer off until switching the next
layer on.
!
00 = 10 sec.; Please consider the internal block-
times of the connected burner controllers to make
the correct settings.
HYST BURNER2
(for solid fuel / 2. burner)
(only for 2-stage burners or solid fuel integration)
Solid fuel integration: Hysteresis for the charging pump
2nd Burner 2 and burner stage 2: see next page =>
Switching pattern for 2-stage burners
HS COOL-FCT
(cooling function for boiler)
with T-HS COOL
(starting temperature for cooling)
!
Applies to all boilers connected to the controller!
If the cooling function for the boiler is activated (HS-
COOLFCT = 01), then the heating circuits commence
operation with T-FLOW MAX as soon as the set starting
temperature T-HS COOL is exceeded by one of the
boilers. the cooling function terminates when the
temperature drops below the starting temperature T-HS
COOL by 5K.