32
FRAMING
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
#CLW-ST R.1 February 2021
3.9.5 Top Vented Cavity Framing
NOTE: This vented cavity option allows the use of 19 gauge or less
hardware mesh that is 1/2” x 1/2” to prevent any items from entering
the vented cavity. This hardware mesh is optional and the only
approved item for use within the air discharge opening.
WARNING: Do NOT cover or place any items in the area of the air
discharge opening. Failure to comply with these instructions could
create a fire hazard. Grilles and louvers are not allowed in the discharge
opening.
WARNING: Ensure air flow within the air discharge opening is not
restricted in any way.
WARNING: Enclosure measurements must maintain minimum framing
specifications for full enclosure framing as outlined in Section 3.5.2
Rough Framing on page 18. Shelf enclosure framing is not allowed for
vented cavity installations. Minimum dimensions for the air discharge
MUST BE maintained after all finishing materials are installed.
These are minimum dimensions shown for the air discharge
opening, and the opening may be increased, if desired, as long as all
requirements are followed. It is recommended to limit your opening
for aesthetic purposes and to avoid items falling into the enclosure.
•
Figure 3.24 shows the minimum 1-1/2” (38mm) clearance from
the fireplace enclosure top to the ceiling on all three sides of the
enclosure.
•
Figure 3.24 is shown with an air discharge overhang in front of
the air discharge opening. This optional installation method can
provide a means to visually hide the air discharge opening.
Figure 3.24, Top Vented (all 3 sides) Cavity Installation
76”
(1930mm)
Min
Max
6”
(152mm)
1
½
”
(38mm) Min
8”
(203mm) Min
6”
(152mm) Max
Max
6”
(152mm)
8”
(203mm) Min
1
½
”
(38mm) Min
8”
(203mm) Min
Air discharge opening
entire top (all three sides)
at 1
½
” min
Air discharge overhang
Enclosure top
must be installed
Air discharge overhang
Air discharge opening
TOP VENTED CAVITY INSTALLATION ONLY