16
FRAMING
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
#CLW-ST R.1 February 2021
3.4.2 #CWST-SAK Shelf Application Kit
Sold separately.
If you are planning to frame out for a shelf enclosure installation, the
stand-offs and heat shield must be installed.
1. Remove and save (4) screws securing top stand-off brackets on
top of the fireplace. Discard top stand-off brackets.
2. Attach the stand-offs to the heat shield with the screws included
with the kit, as shown below. The smaller stand-offs will be
installed near the vent cutout.
3. Align the assembled shelf application kit with the holes on top
of the fireplace, as shown below. The cutout with the 1” (25mm)
clearance tab must be against the flue collar.
4. Secure shelf application kit to the fireplace with screws
previously removed.
Figure 3.6, #CWST-SAK Installation
1” (25mm) clearance tab