The position of service grease nipple of each injector is as follows.
(1) Boom cylinder foot pin (R.H.) (2 places)
(2) Boom cylinder foot pin (L.H.) (2 places)
(3) Boom foot pin (R.H.) (2 places)
(4) Boom foot pin (L.H.) (2 places)
(5) Boom cylinder rod pin (R.H.) (1 place)
(6) Boom cylinder rod pin (L.H.) (1 place)
(7) Arm cylinder foot pin (1 place)
(8) Boom and arm connection pin (2 places)
(9) Bucket cylinder foot pin (R.H.) (1 place)
(10) Bucket cylinder foot pin (L.H.) (1 place)
HANDLE AUTO-GREASING SYSTEM
ATTACHMENTS AND OPTIONS
6-22
Содержание PC1250-11
Страница 2: ......
Страница 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Страница 24: ......
Страница 66: ......
Страница 67: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 73: ...REMARK The above figure does not show all of the caution lamp symbols OPERATION GENERAL VIEW 3 7...
Страница 317: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Страница 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Страница 400: ......
Страница 401: ...SPECIFICATIONS 5 1...
Страница 406: ......
Страница 435: ...REPLACEMENT PARTS 7 1...
Страница 444: ......
Страница 452: ...PC1250 11 PC1250SP 11 HYDRAULIC EXCAVATOR Form No EENAM03651 2018 KOMATSU All Rights Reserved Printed in Belgium 06 2018...