5.
Pull out projections (2) (6 places) on the back of the floor
mat and remove the floor mat.
6.
Remove the cap from water drain hole (3).
7.
Flush out the dirt on the floor directly with water through
water drain hole (3).
8.
After completing the washing work, install the cap in water
drain hole (3).
9.
Fit the floor mat and secure it by inserting projections (2)
into the holes.
METHOD FOR SETTING MACHINE AT ANGLE
You can set the machine at an angle by using a slope or blocks. Consider the condition of the machine and
select the safe method.
METHOD FOR USING SLOPE
k
k
WARNING
Select a solid and smooth slope.
Always block the tracks from movement, and thrust the work equipment into the ground.
1.
Stop the machine with the work equipment on the downhill side on a slope.
2.
Block the tracks from movement and thrust the work
equipment into the ground.
MAINTENANCE
MAINTENANCE PROCEDURE
4-31
Содержание PC1250-11
Страница 2: ......
Страница 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Страница 24: ......
Страница 66: ......
Страница 67: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 73: ...REMARK The above figure does not show all of the caution lamp symbols OPERATION GENERAL VIEW 3 7...
Страница 317: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Страница 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Страница 400: ......
Страница 401: ...SPECIFICATIONS 5 1...
Страница 406: ......
Страница 435: ...REPLACEMENT PARTS 7 1...
Страница 444: ......
Страница 452: ...PC1250 11 PC1250SP 11 HYDRAULIC EXCAVATOR Form No EENAM03651 2018 KOMATSU All Rights Reserved Printed in Belgium 06 2018...