• When the arm is operated IN from a high position for dig-
ging under no load, the arm speed drops momentarily at
the vertical position.
• When performing bucket CURL operation from a high posi-
tion for digging under no load, the bucket speed drops mo-
mentarily at the horizontal position.
• The bucket or arm wobbles by itself during heavy-duty dig-
ging operations.
• When starting or stopping the swing, a noise is generated from the brake valve.
• When going down a steep slope at low speed, a noise is generated from the travel motor brake valve.
PRECAUTIONS FOR TOWING MACHINE
k
k
WARNING
Use the correct towing equipment and towing method. Any
mistake in the selection of the wire rope or drawbar or the
method for towing a disabled machine and being towed
may lead to serious personal injury or death.
• Always confirm that the wire rope or drawbar used for
towing has ample strength for the weight of the ma-
chine being towed.
• A wire rope having cut strands (A), reduced diameter
(B), or kinks (C) may break. Never use such a wire
rope.
• Wear the leather gloves always when handling the wire
ropes.
• Never tow a machine on a slope.
• During the towing operation, never stand between the
towing machine and the machine being towed.
• Operate the machine slowly and be careful not to ap-
ply any sudden load to the wire rope.
NOTICE
The maximum towing capacity for this machine is 686000 N {70000 kg} .
Do not tow any load greater than this.
TROUBLES AND ACTIONS
OPERATION
3-240
Содержание PC1250-11
Страница 2: ......
Страница 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Страница 24: ......
Страница 66: ......
Страница 67: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 73: ...REMARK The above figure does not show all of the caution lamp symbols OPERATION GENERAL VIEW 3 7...
Страница 317: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Страница 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Страница 400: ......
Страница 401: ...SPECIFICATIONS 5 1...
Страница 406: ......
Страница 435: ...REPLACEMENT PARTS 7 1...
Страница 444: ......
Страница 452: ...PC1250 11 PC1250SP 11 HYDRAULIC EXCAVATOR Form No EENAM03651 2018 KOMATSU All Rights Reserved Printed in Belgium 06 2018...