1) Open the grease pump box on the right side of the
machine.
2) Remove the bolts (1) (3 pieces), and remove the plate
(2) from the spare storage of grease can.
3) Remove the bolts (3) (4 pieces) on top of the revolving
frame, and remove the cover (4).
4) Apply the socket wrench (width across flats : 50 mm)
and extension bar to the bolt (A), and tighten the bolt.
Tightening torque of bolt (A)
Target value: 2205 Nm {225 kgm}
Allowable range: 1960 to 2450 Nm {200 to 250 kgm}
2.
Procedure for tightening swing circle bolt (B)
1) Perform the swing of upper structure by 90 ° against
the undercarriage.
2) Apply the socket wrench (width across flats : 50 mm)
and extension bar to the bolt (B) from the right (or left)
side of the undercarriage frame, and tighten the bolt.
Tightening torque of bolt (B)
Target value: 2205 Nm {225 kgm}
Allowable range: 1960 to 2450 Nm {200 to 250 kgm}
MAINTENANCE PROCEDURE
MAINTENANCE
4-82
Содержание PC1250-11
Страница 2: ......
Страница 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Страница 24: ......
Страница 66: ......
Страница 67: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 73: ...REMARK The above figure does not show all of the caution lamp symbols OPERATION GENERAL VIEW 3 7...
Страница 317: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Страница 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Страница 400: ......
Страница 401: ...SPECIFICATIONS 5 1...
Страница 406: ......
Страница 435: ...REPLACEMENT PARTS 7 1...
Страница 444: ......
Страница 452: ...PC1250 11 PC1250SP 11 HYDRAULIC EXCAVATOR Form No EENAM03651 2018 KOMATSU All Rights Reserved Printed in Belgium 06 2018...