10-48
SK714-5 SK815-5 SK815-5 turbo
Operation
When the lift arm raise and the bucket digging are operated at the same time.
•
The lift arm spool (1) and the bucket spool (2) stroke fully.
•
When this happens, the bucket digging
PPC
pressure is sent by passage
H
.
Then the combination circulating valve (3) strokes fully to the right and also the lift arm raise
PPC
pressure is sent
by passage
E
.
Then the leveling circulating valve (4) strokes fully to the left.
•
Return flow rate from the lift arm cylinder passes through passage
A
.
Then it is divided to passage
B
and
C
, by the leveling circulating valve (4) and the combination circulating valve (3).
•
When this happens, the flow divider (5) is operated as
P1=P2
, so flow rate (
Q1
,
Q2
) is divided to passage
B
and
C
in proportion to the area of opening as below expression.
Q1:Q2
= (notch (
b
) + notch (
d
)): notch (
C
)
Q1
= flow rate flows to
B
Q2
=flow rate flows to
C
•
If the bucket load becomes beyond a certain valve by influences of digging, the series-parallel switching valve (7)
strokes to the right.
Then it passes thorough passage
G
by opening notch (
e
).
And then the spring chamber of flow divider (5) is connected to tank.
•
As a result, flow divider strokes fully to the right, and
P2=T
Return flow rate from the lift arm is connected with tank totally, and
Q1
=0L/min.
•
When this happens, notch (
f
) of the lift arm spool and notch (
a
) of the bucket spool open, so the lift arm and the bucket
become parallel circuit (
CLSS
).
And flow rate of the lift arm raise (
Q3
) and teh bucket digging flow rate are divided as below expression.
Q3:Q4
= notch (
f
): notch (
a
)
STRUCTURE AND FUNCTION
CLSS
Содержание SK714-5
Страница 1: ...WEBM005500 ...
Страница 2: ......
Страница 3: ...SK714 5 SK815 5 SK815 5 turbo WEBM005500 00 1 ...
Страница 18: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 38: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 83: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 108: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 112: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 118: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 126: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 172: ......
Страница 174: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 236: ...40 2 SK714 5 SK815 SK815 5 turbo5 P T O RKS01091 195 Nm 80 Nm 80 Nm STANDARD MAINTENANCE P T O ...
Страница 253: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 256: ......
Страница 257: ......
Страница 258: ...2003 ...