
30-45
SK714-5 SK815-5 SK815-5 turbo
REMOVAL OF THE HUB WHEEL
1 - Place the machine on blocks that are high enough to
raise the wheels from the ground, and fully raise the
working equipment.
2 - 2 – Loosen the nuts (1) and take off the tire (2).
3 - Loosen the drainage plug (3) in order to drain the chain-
gearing lubrication oil.
Gear-box oil: max. 14.4
★
To facilitate oil drainage, remove the vent plug (4).
4 - Loosen the nuts (5) and take off the cover (6).
★
Check the condition of the seal (7) and install a new
one if necessary.
RKS01750
RKSA0730
1
2
1
RKSA1190
4
3
RKSA0740
7
5
6
5
2
REMOVAL AND INSTALLATION
HUB WHEEL
Содержание SK714-5
Страница 1: ...WEBM005500 ...
Страница 2: ......
Страница 3: ...SK714 5 SK815 5 SK815 5 turbo WEBM005500 00 1 ...
Страница 18: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 38: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 83: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 108: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 112: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 118: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 126: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 172: ......
Страница 174: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 236: ...40 2 SK714 5 SK815 SK815 5 turbo5 P T O RKS01091 195 Nm 80 Nm 80 Nm STANDARD MAINTENANCE P T O ...
Страница 253: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 256: ......
Страница 257: ......
Страница 258: ...2003 ...