5: Maintenance
5-2
UPS306-01-00 PowerWAVE 9000 DPA User Manual Dated 01-06-2010
5.5
Battery Testing
The battery test takes approximately 3 minutes and should be performed only if:
• There are no alarm conditions
• The battery is fully charged
• The input mains supply is present
Battery testing can be carried out independently of the operating mode (Off-line or On-line) and whether or
not the load is connected.
The battery test procedure can be performed from the UPS front panel (See paragraph 4.3.5).
5.6
Battery Maintenance
The battery maintenance shall be done by an authorized Kohler Uninterruptible Power Service Partner.
5.7
Battery Disposal and Recycling
Batteries contain dangerous substances that will harm the environment if thrown away. If you change the
batteries yourself, call qualified organizations for battery disposal and recycling.
Содержание PW 9000DPA
Страница 1: ...User Manual Pioneering solutions for total power protection Kohler PW 9000DPA ...
Страница 2: ......
Страница 8: ...iv UPS306 01 00 PowerWAVE 9000 DPA User Manual Dated 01 06 2010 ...
Страница 10: ...1 Safety 1 2 UPS306 01 00 PowerWAVE 9000 DPA User Manual Dated 01 06 2010 ...
Страница 18: ...2 Description 2 8 UPS306 01 00 PowerWAVE 9000 DPA User Manual Dated 01 06 2010 ...
Страница 76: ...7 Options 7 6 UPS306 01 00 PowerWAVE 9000 DPA User Manual Dated 01 06 2010 ...
Страница 85: ...UPS306 01 00 PowerWAVE 9000 DPA User Manual Dated 01 06 2010 8 9 8 Specifications ...
Страница 86: ...8 Specifications 8 10 UPS306 01 00 PowerWAVE 9000 DPA User Manual Dated 01 06 2010 ...