TP-6461 1/08
65
Section 4 Controller Test and Replacement
Load control contacts close
Post-transfer load control (as programmed*)
Transfer to standby source
Generator set engine start contacts close
Preferred-to-standby time delay and pre-transfer
load control time delays (as programmed*)
In-phase monitor or transfer to off
(as programmed*)
Standby-to-preferred time delay and pre-transfer
load control (as programmed*)
Load control contacts close
Transfer to preferred source and post-transfer
load control (as programmed*)
Load control contacts open
Test started
Time delay engine cooldown (TDEC)
(as programmed*) (default = 0)
Generator set engine start contacts open
In-phase monitor or transfer to off
(as programmed*)
Test ended
* See the Transfer Switch Operation and Installation Manual.
Load control contacts open
Figure 4-9
Test with Load Sequence
Содержание KGP
Страница 2: ......
Страница 6: ...TP 6461 1 08 6 Notes ...
Страница 10: ...TP 6461 1 08 10 Safety Precautions and Instructions Notes ...
Страница 22: ...TP 6461 1 08 22 Section 1 Scheduled Maintenance Notes ...
Страница 36: ...TP 6461 1 08 36 Section 2 Controller Troubleshooting Notes ...
Страница 54: ...TP 6461 1 08 54 Section 3 Transfer Switch Troubleshooting Notes ...
Страница 78: ...TP 6461 1 08 78 Section 4 Controller Test and Replacement Notes ...
Страница 86: ...TP 6461 1 08 86 Section 5 Component Replacement Model KGS KGP Notes ...
Страница 100: ...TP 6461 1 08 100 Section 6 Component Replacement Model KSS Switches Notes ...
Страница 125: ......