2. Position the Valve and Route Piping
Install Support Framing
NOTE:
The position of the 2x4 bracing is dependent on the
thickness of your finished wall. Refer to the
″
Roughing-In
″
Section.
Determine the valve location and install 2x4 bracing behind the
valve plate.
Install bracing at the showerhead and bath spout installation
locations.
Route Piping and Connect the Supplies
IMPORTANT!
Do not use multiple elbows on the bath spout outlet.
Use 1/2
″
NPT threaded adapters or solder 1/2
″
copper directly to
the outlet.
Install 1/2
″
piping and elbows to the showerhead and bath spout
outlets. Use sealant tape on all threaded connections.
Secure the piping to the framing.
Connect the water supplies using 1/2” copper, CPVC, or PEX
components.
Hot Supply
Cold Supply
1/2" Pipe
Nipple
Cap
Sealant
Tape
2x4
Bracing
Kohler Co.
7
1110626-2-H
Spec Seq#: 106
92633
Содержание K-3363
Страница 1: ...Spec Seq 72 S 1...
Страница 15: ...Spec Seq 81 S 2...
Страница 31: ...Spec Seq 90 WF 1...
Страница 49: ......
Страница 50: ...Spec Seq 94 MB 1...
Страница 52: ...5431 West 164th Street Brook Park Ohio 44142 Spec Seq 96 189085...
Страница 53: ...Spec Seq 96 189085...
Страница 54: ...Spec Seq 96 189085...
Страница 55: ...5431 West 164th Street Brook Park Ohio 44142 Spec Seq 96 189085...
Страница 58: ...Cartridge Maintenance Repair Guide Spec Seq 98 361769...
Страница 76: ...Cartridge Maintenance Repair Guide Spec Seq 98 361769...
Страница 94: ...Spec Seq 100 SH 1...
Страница 174: ...Spec Seq 112 SH 2...