
TP-6198 3/15
21
Section 2 Scheduled Maintenance
Perform Service at Intervals Indicated (X)
Before
Starting
Weekly
100 Hr.
(3 Mo.)
300 Hr.
(6 Mo.)
400 Hr.
(Yearly)
Fuel System
Check the fuel level and fill as necessary (LP)
X
Check the solenoid valve operation *
X
Check the fuel lines and replace as necessary *
X
Lubrication System
Check the crankcase oil level and add oil as necessary
X
24 hr.
Replace the oil in the crankcase
X
200 hr.
Replace the lube oil filter element
X
200 hr.
Cooling System
Check the coolant level and fill as necessary
X
Inspect the radiator and hoses
X
Check the belt tension and condition *
X
Check the coolant protection and tighten the hose clamps *
X
Flush the cooling system *
X
800 hr.
Ignition System
Clean and regap the spark plugs
X
Replace the spark plugs
X
800 hr.
Intake/Exhaust System
Inspect the exhaust system components *
X
Check the installation and operation of CO detectors
X
Check the exhaust gas condition during operation
X
Inspect and clean the air cleaner element
X
Replace the air cleaner element
X
Inspect the complete exhaust system
]
X
Electrical System
Keep the battery charged and in good condition
w
X
Check and tighten electrical connections
X
Clean the battery cables as required *
X
Engine and Mounting
Check for fuel, coolant, and oil leakage *
[
X
Retighten all nuts and bolts as required
X
Check tightness of mounting bolts/vibromounts
X
Remote Control System
Check the remote control operation
X
X
Generator Set
Test run the generator set
X
Blow dust out of the generator *
X
Clean collector ring and inspect brushes *
X
1000 hr.
* Consult your local distributor/dealer for service.
[
Read WARNING found at the beginning of manual regarding moving parts.
]
Should be performed by your local distributor/dealer.
w
Consult battery manufacturer’s instructions.
Note:
Hr. refers to hours of generator set operation.
Figure 2-1
Service Schedule
Содержание 15/30RES
Страница 2: ......
Страница 18: ...TP 6198 3 15 18 Section 1 Specifications Notes ...
Страница 62: ...TP 6198 3 15 62 Section 5 Component Testing and Adjustment Notes ...
Страница 71: ......