![KMT STREAMLINE SL-V SRP 100 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/kmt/streamline-sl-v-srp-100/streamline-sl-v-srp-100_operation-and-maintenance-manual_1979679021.webp)
Terms and Conditions of Sale
(LD-101) 05/2007
The Purchaser shall not operate Equipment which is
considered to be defective, without first notifying the Company in
writing of its intention to do so. Any such use of Equipment will
be at the Purchaser's sole risk and liability.
9. Limitation of Liability
THE REMEDIES OF THE PURCHASER SET FORTH
HEREIN ARE EXCLUSIVE, AND THE TOTAL LIABILITY OF
THE COMPANY WITH RESPECT TO THIS CONTRACT OR
THE EQUIPMENT AND SERVICES FURNISHED
HEREUNDER. IN CONNECTION WITH THE PERFORMANCE
OR BREACH THEREOF, OR FROM THE MANUFACTURE,
SALE, DELIVERY, INSTALLATION, REPAIR OR
TECHNICAL DIRECTION COVERED BY OR FURNISHED
UNDER THIS CONTRACT, WHETHER BASED ON
CONTRACT WARRANTY, NEGLIGENCE, INDEMNITY,
STRICT LIABILITY OR OTHERWISE, SHALL NOT EXCEED
THE PURCHASE PRICE OF THE UNIT OF EQUIPMENT
UPON WHICH SUCH LIABILITY IS BASED.
THE COMPANY AND ITS SUPPLIERS SHALL IN NO
EVENT BE LIABLE TO THE PURCHASER, ANY
SUCCESSORS IN INTEREST OR ANY BENEFICIARY OR
ASSIGNEE OF THIS CONTRACT FOR ANY
CONSEQUENTIAL, INCIDENTAL, INDIRECT, SPECIAL OR
PUNITIVE DAMAGES ARISING OUT OF THIS CONTRACT
OR ANY BREACH THEREOF, OR ANY DEFECT IN, OR
FAILURE OF, OR MALFUNCTION OF THE EQUIPMENT
HEREUNDER, WHETHER BASED UPON LOSS OF USE,
LOST PROFITS OR REVENUE, INTEREST, LOST
GOODWILL, WORK STOPPAGE, IMPAIRMENT OF OTHER
GOODS, LOSS BY REASON OF SHUTDOWN OR NON-
OPERATION, INCREASED EXPENSES OF OPERATION,
COST OF PURCHASE OF REPLACEMENT POWER OR
CLAIMS OF PURCHASER OR CUSTOMERS OF PURCHASER
FOR SERVICE INTERRUPTION WHETHER OR NOT SUCH
LOSS OR DAMAGE IS BASED ON CONTRACT,
WARRANTY, NEGLIGENCE, INDEMNITY, STRICT
LIABILITY OR OTHERWISE.
10. Nuclear Liability
In the event that the Equipment sold hereunder is to be used in
a nuclear facility, the Purchaser shall, prior to such use, arrange for
insurance or governmental indemnity protecting the Company
against liability and hereby releases and agrees to indemnify the
Company and its suppliers for any nuclear damage, including loss
of use, in any manner arising out of a nuclear incident, whether
alleged to be due, in whole or in part to the negligence or otherwise
of the Company or its suppliers.
11. Governing Law
The rights and obligations of the parties shall be governed by
the laws of the State of Delaware excluding any conflicts of law
provisions. The United Nations Convention on Contracts for the
International Sale of Goods shall not apply to this agreement.
12. Execution
The Company shall not be bound by any contract or any
modification thereto until approved in writing by an officer of the
Company. The contract, when so approved shall supersede all
previous communications, either oral or written.
Содержание STREAMLINE SL-V SRP 100
Страница 1: ...MANUAL 20428408 R08 STREAMLINE SL V SRP 100 WATERJET INTENSIFIER OPERATION AND MAINTENANCE MANUAL ...
Страница 23: ......
Страница 25: ......
Страница 174: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 5 Figure 12 1 SL V SRP 100 Intensifier Unit ...
Страница 176: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 7 Figure 12 2 Intensifier Assembly ...
Страница 180: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 11 Figure 12 5 Pneumatic Valve Actuator Assembly Normally Open ...
Страница 182: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 13 Figure 12 6 Hydraulic Piston Assembly 05136684 ...
Страница 184: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 15 Figure 12 7 High Pressure Piping ...
Страница 186: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 17 Figure 12 8 Low Pressure Water Filter Assembly ...
Страница 188: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 19 Figure 12 9 Hydraulic Power Package ...
Страница 190: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 21 Figure 12 10 Motor Pump Assembly ...
Страница 192: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 23 Figure 12 11 Hydraulic Manifold Assembly ...
Страница 194: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 25 Figure 12 12 Hydraulic Hose Connections ...
Страница 196: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 27 Figure 12 13 Reservoir Assembly ...
Страница 199: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 30 Figure 12 14 Bulkhead Pipe Assembly ...
Страница 201: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 32 Figure 12 15 Cover Assembly ...
Страница 203: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 34 Figure 12 16 Electrical Assembly 200 208 50 60 ...
Страница 205: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 36 Figure 12 17 Electrical Assembly 230 50 60 ...
Страница 207: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 38 Figure 12 18 Electrical Assembly 380 415 50 60 ...
Страница 210: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 41 Figure 12 19 Controls Subassembly 200 208 230 50 60 ...
Страница 213: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 44 Figure 12 20 Controls Subassembly 380 415 50 60 ...
Страница 215: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 46 Figure 12 21 Control Panel Configuration 200 208 50 60 ...
Страница 217: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 48 Figure 12 22 Control Panel Configuration 230 50 60 ...
Страница 219: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 50 Figure 12 23 Control Panel Configuration 380 415 50 60 ...
Страница 221: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 52 Figure 12 24 Proportional Pressure Control 80075732 ...
Страница 223: ...Section 12 Parts List 20428786 2 2008 Rev 05 12 54 Figure 12 25 High Pressure Transducer ...
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 227: ......
Страница 228: ......
Страница 229: ......
Страница 230: ......
Страница 231: ......
Страница 232: ......
Страница 233: ......
Страница 234: ......
Страница 235: ......
Страница 236: ......
Страница 237: ......
Страница 238: ......
Страница 239: ......