The Varisol product range is available with a choice of roof fixing options to suit many roof 

types, see diagram below for the most common fixings. Roof fixings are available for slate, 

tiled, double lap plain clay, metal seam and concrete. For others please contact Kingspan. 

The most common fixings are illustrated and explained in the following section and may be 

easily secured to slate, tile or masonry finishes.

Roof kits and their relevant manufacturer codes:

Horizontal Installations

With any installation where the collector is installed horizontally on a wall façade or roof 

surface; the airvent on the collector manifold must be the highest point of the collector, 

otherwise air in the system will remain in the pipes within the collector tubes and be difficult 

to flush out. Airlocks in the pipes will stop circulation through the system.

When the collector is orientated correctly, i.e. with the manifold slightly higher than the base 

of the collector, (see below) air will be forced back into the system. In this instance the air 

separator will prevent air from circulating.

Roof Kits

3

1

2

5

4

Varisol Installation Manual

05

04

Flat horizontal orientation

(option 4 above)

Wall horizontal installation

(option 5 above)

Minimum 2˚ angle

Minimum 2˚ angle

  Option 

Code 

Description 

 

KSK0039 

Varisol 10 Sloping Roof Kit

 

 

KSK0040 

Varisol 20 Sloping Roof Kit

 

 

KSK0041 

Varisol 30 Sloping Roof Kit

 

 

KSK0062 

Varisol 10 Bolt Down Roof Kit

 

 

KSK0063 

Varisol 20 Bolt Down Roof Kit

 

 

KSK0064 

Varisol 30 Bolt Down Roof Kit 

 

KSK0042 

Varisol 10 A Frame Kit

 

 

KSK0043 

Varisol 20 A Frame Kit

 

 

KSK0044 

Varisol 30 A Frame Kit

  3, 4 and 5 

KSK0065 

Varisol 10 Façade Kit

 

 

KSK0066 

Varisol 20 Façade Kit

 

 

KSK0067 

Varisol 30 Façade Kit 

 Min

 Min

Содержание Varisol

Страница 1: ...Renewables Installation Manual...

Страница 2: ...alling Tubes 7 Attaching the connection kit 9 Pump station 12 Safety vessel connections 13 Wiring the control panel 14 Commissioning the system 16 Decommissioning the system 17 Recycling Information 1...

Страница 3: ...idance Tube boxes should be transported horizontally Heavy goods should not be loaded on top of the kit boxes Care should be taken when opening boxes to prevent scratches or sudden shocks to the glass...

Страница 4: ...ts Flexi Connections Cooling Vessel DF100 only Expansion Vessel Tyfocor LS Connection Kit Tubes Insulated Hose Mounting Set Solar Roof Flashing 22mm 3 Port Diverter Valve Note 15 28mm also available 2...

Страница 5: ...21 5 300 22 35 6 360 22 53 7 420 22 80 8 480 22 110 9 540 22 153 Collector Area m2 Varisol Collector Expansion Vessel Sizing System Volume Ltr Expansion Vessel Size Ltr Cooling Vessel Size Ltr Static...

Страница 6: ...or tubes and be difficult to flush out Airlocks in the pipes will stop circulation through the system When the collector is orientated correctly i e with the manifold slightly higher than the base of...

Страница 7: ...d collector the available rafter spacing should be considered when sizing the collector to ensure that an appropriate side rail spacing can be achieved Roof Kit Sizing 05 Collector Number of Kit Type...

Страница 8: ...ackets C to roof using M8x50 coachscrews E 3 Secure side rails A to lower brackets using M10x65 bolt assy Step Two 1 From upper end of each side rail slide 2 M8x16 bolt into position 2 Secure side rai...

Страница 9: ...upper and lower support rail to 90 bracket as shown below 07 Installing the first tube Step Four 1 Align first tube with end of support rail and push home by clicking into rail push on upper push poi...

Страница 10: ...otection is removed first Step Six 1 Rotate second tube parallel with first tube 2 Locate upper plastic enclosure and lower tube support clip in rail 3 Push home the upper and lower fittings into the...

Страница 11: ...F 5 Ensure clip F legs protrude out of bottom of enclosure 6 Complete and attach technical label I 7 Close lid and secure with screw E G A D F I Qty Tubes A B C D E F G H I Step Nine flow connection 1...

Страница 12: ...EX ALU PEX or GALVANISED TUBING OR FITTINGS SHOULD NOT BE USED UNDER ANY CIRCUMSTANCES Flexible Pipe Connections Flexible pipe connections are recommended to connect the manifold through the building...

Страница 13: ...pression fittings provided for direct copper connection C0784 Insulated Hose Stub Fitting When flexible stainless steel pipe is being used to connect to the pump station the insulated hose stub fittin...

Страница 14: ...upplied includes an appropriate corrugated hose and threaded connection to join the vessel to the pump station Temperature Reducing Vessel TRV Also known as a cooling vessel or stratification vessel t...

Страница 15: ...in core copper cable with a 0 75mm cross section The sensors supplied are 1 5 metres in length Sensor cables can be extended with twin core copper cable of 0 75mm diameter up to 50 metres and 1 50mm d...

Страница 16: ...i e for an east west panel array or a stagnation configuration requiring a second pump Caution Avoiding damage and malfunctions When connecting an external relay or contactor or when connecting a pump...

Страница 17: ...e above the flow meter to ensure all air and liquid passes through the fill centre to filter any air and contaminants 4 Run the fill centre pump to circulate the Tyfocor LS for approximately 20 minute...

Страница 18: ...ceeding 170 C and pressures greater than 6 bar a solar installation should only be decommissioned by a trained individual The system should be decommissioned in low light ideally in the morning when t...

Страница 19: ...ith water Propylene glycol is not harmful to aquatic organisms and is readily biodegradable however the disposal of the solution should be done in a responsible manner taking into consideration local...

Страница 20: ...ifreeze properties the system should be refilled with fresh Tyfocor LS It is recommended that the solar system is serviced annually by a qualified engineer and immediately if the system shows evidence...

Страница 21: ...111 177 287 177 287 266 430 137 137 137 137 206 206 8 8 to 20 20 Tube Collector Height Above Ground m 30 Tube Collector 10 Tube Collector 20 Tube Collector 30 Tube Collector Weight Per Foot kg 45 Wind...

Страница 22: ...pond with specification shall be notified to Kingspan Renewable Ltd within 7 days from the delivery date or where the defect was not apparent on reasonable inspection within a reasonable time after di...

Страница 23: ...21...

Страница 24: ...opment and improvement we reserve the right to alter and amend the specification as shown in this literature Kingspan Renewables Limited 180 Gilford Road Portadown Co Armagh Northern Ireland BT63 5LF...

Отзывы: