Varisol Installation Manual

19

18

Technical Information

Stress and maximum load on the substance on flat roofs to DIN 1055

Prevention of Collector Slippage

Prevention of Collector Lifting

Weight Per Foot (kg)

10 Tube Collector

A

B

A

B

A

B

A

B

A

B

A

B

76

102

76

102

116

155

26

65

26

65

41

100

129

178

129

178

195

269

57

125

51

125

80

191

8

8 to 20

20 Tube Collector

Height Above

Ground (m)

30 Tube Collector

10 Tube Collector

20 Tube Collector

30 Tube Collector

Weight Per Foot (kg)

25°

Stress and maximum load on the substance on flat roofs to DIN 1055

Prevention of Collector Slippage

Prevention of Collector Lifting

Weight Per Foot (kg)

10 Tube Collector

A

B

A

B

A

B

A

B

A

B

A

B

102

171

102

171

156

256

73

73

73

73

111

111

177

287

177

287

266

430

137

137

137

137

206

206

8

8 to 20

20 Tube Collector

Height Above

Ground (m)

30 Tube Collector

10 Tube Collector

20 Tube Collector

30 Tube Collector

Weight Per Foot (kg)

45°

Wind Loading

Technical Specification

Dimensions per tube

(Length x Width x Height) [mm]

Weight per tube 

(kg)

Volume per tube

 (l)

Max. Field Size

 (m

²

)

Cu Pipe Diameter

(mm)*

     

Max. Operating Pressure 

(bar)

Min. Slope 

(°)

Max. Slope

 (°)

Max. Load 

(kN/m²)

 

(DIN 1055-5)

Heat Transfer Mediu

m

6

0

90

2.5

Propylene Glycol suitable for evacuated tube collectors

1950 x 70.9 x 70.9

2.2

0.14

150 Tubes = 21m

²

 (Gross) / 15m

²

 (Apperture)

1-3m²
4-9m²
10-15m²
16-20m²

15 x 1
22 x 1
28 x 1.2
35 x 1.5

Pressure Drop Curves

* Pipe diameters calculated for 0.1l/min/tube and v_max = 0.5m/s

Flow Rate (ltr/hr)

Varisol Pressure Drop

(Tyfocor LS)

Pr

essur

e Dr

op (mbar)

120

100

80

60

40

20

0

0

50

100

150

200

250

300

350

400

450

500

90-way
60-way

40-way

30-way

20-way

Содержание Varisol

Страница 1: ...Renewables Installation Manual...

Страница 2: ...alling Tubes 7 Attaching the connection kit 9 Pump station 12 Safety vessel connections 13 Wiring the control panel 14 Commissioning the system 16 Decommissioning the system 17 Recycling Information 1...

Страница 3: ...idance Tube boxes should be transported horizontally Heavy goods should not be loaded on top of the kit boxes Care should be taken when opening boxes to prevent scratches or sudden shocks to the glass...

Страница 4: ...ts Flexi Connections Cooling Vessel DF100 only Expansion Vessel Tyfocor LS Connection Kit Tubes Insulated Hose Mounting Set Solar Roof Flashing 22mm 3 Port Diverter Valve Note 15 28mm also available 2...

Страница 5: ...21 5 300 22 35 6 360 22 53 7 420 22 80 8 480 22 110 9 540 22 153 Collector Area m2 Varisol Collector Expansion Vessel Sizing System Volume Ltr Expansion Vessel Size Ltr Cooling Vessel Size Ltr Static...

Страница 6: ...or tubes and be difficult to flush out Airlocks in the pipes will stop circulation through the system When the collector is orientated correctly i e with the manifold slightly higher than the base of...

Страница 7: ...d collector the available rafter spacing should be considered when sizing the collector to ensure that an appropriate side rail spacing can be achieved Roof Kit Sizing 05 Collector Number of Kit Type...

Страница 8: ...ackets C to roof using M8x50 coachscrews E 3 Secure side rails A to lower brackets using M10x65 bolt assy Step Two 1 From upper end of each side rail slide 2 M8x16 bolt into position 2 Secure side rai...

Страница 9: ...upper and lower support rail to 90 bracket as shown below 07 Installing the first tube Step Four 1 Align first tube with end of support rail and push home by clicking into rail push on upper push poi...

Страница 10: ...otection is removed first Step Six 1 Rotate second tube parallel with first tube 2 Locate upper plastic enclosure and lower tube support clip in rail 3 Push home the upper and lower fittings into the...

Страница 11: ...F 5 Ensure clip F legs protrude out of bottom of enclosure 6 Complete and attach technical label I 7 Close lid and secure with screw E G A D F I Qty Tubes A B C D E F G H I Step Nine flow connection 1...

Страница 12: ...EX ALU PEX or GALVANISED TUBING OR FITTINGS SHOULD NOT BE USED UNDER ANY CIRCUMSTANCES Flexible Pipe Connections Flexible pipe connections are recommended to connect the manifold through the building...

Страница 13: ...pression fittings provided for direct copper connection C0784 Insulated Hose Stub Fitting When flexible stainless steel pipe is being used to connect to the pump station the insulated hose stub fittin...

Страница 14: ...upplied includes an appropriate corrugated hose and threaded connection to join the vessel to the pump station Temperature Reducing Vessel TRV Also known as a cooling vessel or stratification vessel t...

Страница 15: ...in core copper cable with a 0 75mm cross section The sensors supplied are 1 5 metres in length Sensor cables can be extended with twin core copper cable of 0 75mm diameter up to 50 metres and 1 50mm d...

Страница 16: ...i e for an east west panel array or a stagnation configuration requiring a second pump Caution Avoiding damage and malfunctions When connecting an external relay or contactor or when connecting a pump...

Страница 17: ...e above the flow meter to ensure all air and liquid passes through the fill centre to filter any air and contaminants 4 Run the fill centre pump to circulate the Tyfocor LS for approximately 20 minute...

Страница 18: ...ceeding 170 C and pressures greater than 6 bar a solar installation should only be decommissioned by a trained individual The system should be decommissioned in low light ideally in the morning when t...

Страница 19: ...ith water Propylene glycol is not harmful to aquatic organisms and is readily biodegradable however the disposal of the solution should be done in a responsible manner taking into consideration local...

Страница 20: ...ifreeze properties the system should be refilled with fresh Tyfocor LS It is recommended that the solar system is serviced annually by a qualified engineer and immediately if the system shows evidence...

Страница 21: ...111 177 287 177 287 266 430 137 137 137 137 206 206 8 8 to 20 20 Tube Collector Height Above Ground m 30 Tube Collector 10 Tube Collector 20 Tube Collector 30 Tube Collector Weight Per Foot kg 45 Wind...

Страница 22: ...pond with specification shall be notified to Kingspan Renewable Ltd within 7 days from the delivery date or where the defect was not apparent on reasonable inspection within a reasonable time after di...

Страница 23: ...21...

Страница 24: ...opment and improvement we reserve the right to alter and amend the specification as shown in this literature Kingspan Renewables Limited 180 Gilford Road Portadown Co Armagh Northern Ireland BT63 5LF...

Отзывы: