Connection Information

In any solar panel system, the ‘return’ refers to the intake in the collector where liquid 
is returning to be reheated. The ‘flow’ refers to the collector side where the liquid is 
flowing to the heat exchanger.

Note: It is essential that the collector temperature sensor is located in the flow
of the collector.

The following illustrations shows the connections to the manifold.

Types of Connections

The only pipes which should be used with a solar installation are copper pipe, continuous 
flexible stainless steel or mild steel.

When using copper pipe, only compression or brazed joints can be used. Solder and 
galvanised fittings will not withstand high temperature or expansion and are therefore not 
suitable for solar pipe work.

PEX / PLASTIC / PEX-ALU-PEX or GALVANISED TUBING OR FITTINGS

SHOULD 

NOT BE USED UNDER ANY CIRCUMSTANCES 

Flexible Pipe Connections

Flexible pipe connections are recommended to connect the manifold through the building 
fabric and allow flexibility in connecting to the internal pipe work.

Flexible stainless steel pipes are available in both a 15mm and 22mm diameter. If 
connecting one diameter pipe to another, a suitable reducer compression fitting is 
recommended to make the connection.  

Insulation

All pipe work on the solar loop should be insulated with high temperature insulation (such 
as HT/Armaflex from Armacell GmbH). High temperature insulation is essential as standard 
pipe insulation will melt at temperatures experienced by solar pipes.

The wall thickness of the insulation should be equal to the diameter of the pipe. The only 
pipes which should not be insulated are the pipes to the safety vessels as they should 
allow heat to dissipate when the system is experiencing excessive heat and pressure.

Содержание Varisol

Страница 1: ...Renewables Installation Manual...

Страница 2: ...alling Tubes 7 Attaching the connection kit 9 Pump station 12 Safety vessel connections 13 Wiring the control panel 14 Commissioning the system 16 Decommissioning the system 17 Recycling Information 1...

Страница 3: ...idance Tube boxes should be transported horizontally Heavy goods should not be loaded on top of the kit boxes Care should be taken when opening boxes to prevent scratches or sudden shocks to the glass...

Страница 4: ...ts Flexi Connections Cooling Vessel DF100 only Expansion Vessel Tyfocor LS Connection Kit Tubes Insulated Hose Mounting Set Solar Roof Flashing 22mm 3 Port Diverter Valve Note 15 28mm also available 2...

Страница 5: ...21 5 300 22 35 6 360 22 53 7 420 22 80 8 480 22 110 9 540 22 153 Collector Area m2 Varisol Collector Expansion Vessel Sizing System Volume Ltr Expansion Vessel Size Ltr Cooling Vessel Size Ltr Static...

Страница 6: ...or tubes and be difficult to flush out Airlocks in the pipes will stop circulation through the system When the collector is orientated correctly i e with the manifold slightly higher than the base of...

Страница 7: ...d collector the available rafter spacing should be considered when sizing the collector to ensure that an appropriate side rail spacing can be achieved Roof Kit Sizing 05 Collector Number of Kit Type...

Страница 8: ...ackets C to roof using M8x50 coachscrews E 3 Secure side rails A to lower brackets using M10x65 bolt assy Step Two 1 From upper end of each side rail slide 2 M8x16 bolt into position 2 Secure side rai...

Страница 9: ...upper and lower support rail to 90 bracket as shown below 07 Installing the first tube Step Four 1 Align first tube with end of support rail and push home by clicking into rail push on upper push poi...

Страница 10: ...otection is removed first Step Six 1 Rotate second tube parallel with first tube 2 Locate upper plastic enclosure and lower tube support clip in rail 3 Push home the upper and lower fittings into the...

Страница 11: ...F 5 Ensure clip F legs protrude out of bottom of enclosure 6 Complete and attach technical label I 7 Close lid and secure with screw E G A D F I Qty Tubes A B C D E F G H I Step Nine flow connection 1...

Страница 12: ...EX ALU PEX or GALVANISED TUBING OR FITTINGS SHOULD NOT BE USED UNDER ANY CIRCUMSTANCES Flexible Pipe Connections Flexible pipe connections are recommended to connect the manifold through the building...

Страница 13: ...pression fittings provided for direct copper connection C0784 Insulated Hose Stub Fitting When flexible stainless steel pipe is being used to connect to the pump station the insulated hose stub fittin...

Страница 14: ...upplied includes an appropriate corrugated hose and threaded connection to join the vessel to the pump station Temperature Reducing Vessel TRV Also known as a cooling vessel or stratification vessel t...

Страница 15: ...in core copper cable with a 0 75mm cross section The sensors supplied are 1 5 metres in length Sensor cables can be extended with twin core copper cable of 0 75mm diameter up to 50 metres and 1 50mm d...

Страница 16: ...i e for an east west panel array or a stagnation configuration requiring a second pump Caution Avoiding damage and malfunctions When connecting an external relay or contactor or when connecting a pump...

Страница 17: ...e above the flow meter to ensure all air and liquid passes through the fill centre to filter any air and contaminants 4 Run the fill centre pump to circulate the Tyfocor LS for approximately 20 minute...

Страница 18: ...ceeding 170 C and pressures greater than 6 bar a solar installation should only be decommissioned by a trained individual The system should be decommissioned in low light ideally in the morning when t...

Страница 19: ...ith water Propylene glycol is not harmful to aquatic organisms and is readily biodegradable however the disposal of the solution should be done in a responsible manner taking into consideration local...

Страница 20: ...ifreeze properties the system should be refilled with fresh Tyfocor LS It is recommended that the solar system is serviced annually by a qualified engineer and immediately if the system shows evidence...

Страница 21: ...111 177 287 177 287 266 430 137 137 137 137 206 206 8 8 to 20 20 Tube Collector Height Above Ground m 30 Tube Collector 10 Tube Collector 20 Tube Collector 30 Tube Collector Weight Per Foot kg 45 Wind...

Страница 22: ...pond with specification shall be notified to Kingspan Renewable Ltd within 7 days from the delivery date or where the defect was not apparent on reasonable inspection within a reasonable time after di...

Страница 23: ...21...

Страница 24: ...opment and improvement we reserve the right to alter and amend the specification as shown in this literature Kingspan Renewables Limited 180 Gilford Road Portadown Co Armagh Northern Ireland BT63 5LF...

Отзывы: