background image

The modular design of the Varisol collector means that any number of tubes can be 

assembled to make up the required collector size. Since the mounting kit cross rails are 

only supplied in 10, 20 and 30 tube sizes it is necessary to cut the rails to length if an 

intermediate sized collector is required. The table below gives the required length of rail for 

each given size. Burrs and sharp edges should be removed.

Examples:

• To make an 18 tube collector simply take a 20-way rail and cut to 1281mm.

•  To make a 44 tube collector join a standard 20-way rail to a 24-way, the 24-way being 

made by cutting a 30-way rail to 1708mm.

•  In the case of a sloping roof mounted collector, the available rafter spacing should be 

considered when sizing the collector to ensure that an appropriate side rail spacing can 

be achieved.

Roof Kit Sizing

Varisol Installation Manual

05

04

 

Collector 

Number of 

Kit Type 

Required Support 

Side Rail

 

Area 

tubes 

 

Rail Length 

Separation

 

m² 

  

 

mm 

mm

 

 

0.1 

 

71 

 

 

0.2 

 

142 

 

 

0.3 

 

214 

 

 

0.4 

10 Tube Rail 

285 

 

 

0.5 

712mm 

356 

 

 

0.6 

 

427 

 

 

0.7 

 

498 

 

 

0.8 

 

569 

350-450

 

0.9 

 

640 

350-550

 

10 

 

712 

500-600

 

1.1 

11 

 

783 

500-600

 

1.2 

12 

 

854 

500-600

 

1.3 

13 

 

926 

500-700

 

1.4 

14 

 

997 

500-700

 

1.5 

15 

20 Tube Rail 

1068 

600-800

 

1.6 

16 

1423mm 

1139 

600-900

 

1.7 

17 

 

1210 

600-900

 

1.8 

18 

 

1281 

600-1000

 

1.9 

19 

 

1352 

600-1000

 

20 

 

1423 

600-1100

 

2.1 

21 

 

1494 

700-1200

 

2.2 

22 

 

1565 

700-1200

 

2.3 

23 

 

1637 

700-1200

 

2.4 

24 

 

1708 

700-1200

 

2.5 

25 

30 Tube Rail 

1779 

700-1200

 

2.6 

26 

2135mm 

1850 

800-1300

 

2.7 

27 

 

1921 

800-1300

 

2.8 

28 

 

1992 

800-1400

 

2.9 

29 

 

2063 

800-1400

 

30 

 

2135 

800-1400

Содержание Varisol

Страница 1: ...Renewables Installation Manual...

Страница 2: ...alling Tubes 7 Attaching the connection kit 9 Pump station 12 Safety vessel connections 13 Wiring the control panel 14 Commissioning the system 16 Decommissioning the system 17 Recycling Information 1...

Страница 3: ...idance Tube boxes should be transported horizontally Heavy goods should not be loaded on top of the kit boxes Care should be taken when opening boxes to prevent scratches or sudden shocks to the glass...

Страница 4: ...ts Flexi Connections Cooling Vessel DF100 only Expansion Vessel Tyfocor LS Connection Kit Tubes Insulated Hose Mounting Set Solar Roof Flashing 22mm 3 Port Diverter Valve Note 15 28mm also available 2...

Страница 5: ...21 5 300 22 35 6 360 22 53 7 420 22 80 8 480 22 110 9 540 22 153 Collector Area m2 Varisol Collector Expansion Vessel Sizing System Volume Ltr Expansion Vessel Size Ltr Cooling Vessel Size Ltr Static...

Страница 6: ...or tubes and be difficult to flush out Airlocks in the pipes will stop circulation through the system When the collector is orientated correctly i e with the manifold slightly higher than the base of...

Страница 7: ...d collector the available rafter spacing should be considered when sizing the collector to ensure that an appropriate side rail spacing can be achieved Roof Kit Sizing 05 Collector Number of Kit Type...

Страница 8: ...ackets C to roof using M8x50 coachscrews E 3 Secure side rails A to lower brackets using M10x65 bolt assy Step Two 1 From upper end of each side rail slide 2 M8x16 bolt into position 2 Secure side rai...

Страница 9: ...upper and lower support rail to 90 bracket as shown below 07 Installing the first tube Step Four 1 Align first tube with end of support rail and push home by clicking into rail push on upper push poi...

Страница 10: ...otection is removed first Step Six 1 Rotate second tube parallel with first tube 2 Locate upper plastic enclosure and lower tube support clip in rail 3 Push home the upper and lower fittings into the...

Страница 11: ...F 5 Ensure clip F legs protrude out of bottom of enclosure 6 Complete and attach technical label I 7 Close lid and secure with screw E G A D F I Qty Tubes A B C D E F G H I Step Nine flow connection 1...

Страница 12: ...EX ALU PEX or GALVANISED TUBING OR FITTINGS SHOULD NOT BE USED UNDER ANY CIRCUMSTANCES Flexible Pipe Connections Flexible pipe connections are recommended to connect the manifold through the building...

Страница 13: ...pression fittings provided for direct copper connection C0784 Insulated Hose Stub Fitting When flexible stainless steel pipe is being used to connect to the pump station the insulated hose stub fittin...

Страница 14: ...upplied includes an appropriate corrugated hose and threaded connection to join the vessel to the pump station Temperature Reducing Vessel TRV Also known as a cooling vessel or stratification vessel t...

Страница 15: ...in core copper cable with a 0 75mm cross section The sensors supplied are 1 5 metres in length Sensor cables can be extended with twin core copper cable of 0 75mm diameter up to 50 metres and 1 50mm d...

Страница 16: ...i e for an east west panel array or a stagnation configuration requiring a second pump Caution Avoiding damage and malfunctions When connecting an external relay or contactor or when connecting a pump...

Страница 17: ...e above the flow meter to ensure all air and liquid passes through the fill centre to filter any air and contaminants 4 Run the fill centre pump to circulate the Tyfocor LS for approximately 20 minute...

Страница 18: ...ceeding 170 C and pressures greater than 6 bar a solar installation should only be decommissioned by a trained individual The system should be decommissioned in low light ideally in the morning when t...

Страница 19: ...ith water Propylene glycol is not harmful to aquatic organisms and is readily biodegradable however the disposal of the solution should be done in a responsible manner taking into consideration local...

Страница 20: ...ifreeze properties the system should be refilled with fresh Tyfocor LS It is recommended that the solar system is serviced annually by a qualified engineer and immediately if the system shows evidence...

Страница 21: ...111 177 287 177 287 266 430 137 137 137 137 206 206 8 8 to 20 20 Tube Collector Height Above Ground m 30 Tube Collector 10 Tube Collector 20 Tube Collector 30 Tube Collector Weight Per Foot kg 45 Wind...

Страница 22: ...pond with specification shall be notified to Kingspan Renewable Ltd within 7 days from the delivery date or where the defect was not apparent on reasonable inspection within a reasonable time after di...

Страница 23: ...21...

Страница 24: ...opment and improvement we reserve the right to alter and amend the specification as shown in this literature Kingspan Renewables Limited 180 Gilford Road Portadown Co Armagh Northern Ireland BT63 5LF...

Отзывы: