A:
With 2 people on the ground and at least 1 person in the fort, lift the Large Roof Assembly up and over the
Back side of the fort. Guide the Large Roof Assembly onto the Swing Wall side of the fort so all four (320) Roof
Supports sit flush to the front and outside edges of (290) Roof End, (291) Roof End Left and both (310) Mid Roof
Ends. (fig. 35.1 and 35.2)
B:
Attach (320) Roof Supports to (290) Roof End and (291) Roof End Left with 1 (S3) #8 x 2-1/2” Wood Screw
per support. (fig. 35.2)
Step 35: Attach Roof Assemblies to Fort
Part 1
Fig. 35.1
320
Large Roof
Assembly
Hardware
2 x
#8 x 2-1/2” Wood Screw
S3
S3
S3
Swing
Wall
Each
Side
Flush
Flush
Flush
310
320
290
291
Fig. 35.2
Back
70
Содержание Cedar Summit RICHMOND LODGE
Страница 77: ...NOTES 77...