Warning!
To prevent tipping and avoid potential injury, stakes must be
driven 33 cm (13”) into ground. Digging or driving stakes can be dangerous if
you do not check first for under-ground wiring, cables or gas lines.
A:
In the 5 places shown in fig. 18.1 drive the Rebar Ground Stakes 33 cm (13”) into the ground against (040) SL
Panel, on the Front, (091) Diagonal, (021) Right Access and both (150) Heavy SW Posts. Be careful not to hit the
washer while hammering stakes into the ground as this could cause the washer to break off.
B:
Attach ground stakes using 1 (S7) #12 x 2” Pan Screw per ground stake as shown in fig. 18.2.
C:
After driving stakes into the ground, check for sharp edges caused by the impact of the hammer. Smooth any
sharp edges from impact area and touch up with outdoor paint.
Step 18: Install Ground Stakes
MOVE FORT TO FINAL LOCATION PRIOR TO STAKING
FINAL LOCATION MUST BE LEVEL GROUND
Hardware
5 x
#12 x 2” Pan Screw
S7
5 x Rebar Ground Stake
Other Parts
Fig. 18.1
F
ig. 18.2
SEE FRONT COVER FOR
SAFETY CLEARANCE
040
091
Rebar Ground
Stake
021
150
S7
Front
33 cm (13”)
In Ground
47
Содержание Cedar Summit RICHMOND LODGE
Страница 77: ...NOTES 77...