Fig. 41.1
Step 41: Attach Pickets
Wood Parts
4 x
Picket 1-1/2 x 1-1/2 x 33”
Hardware
8 x
#8 x 2-1/2” Wood Screws
A:
From the inside edge of the left (392) Tunnel Post measure 2-1/2” in towards the fort. Place 1 (411) Picket
so it is horizontal to the (343) Tunnel MK Rail Left and (396) Tunnel Rail. Attach using 2 (S3) #8 x 2-1/2” Wood
Screws, making sure that Picket is flush at the top and bottom. (fig. 41.1)
B:
Repeat Step A to install 2 more (411) Pickets on the left side, making sure that there is a 2-1/2” space
between each picket. (fig. 41.1)
C:
On the right side of the tunnel entrance install 1 (411) Picket to the (342) Tunnel MK Rail Right and (395)
Short Tunnel Rail using 2 (S3) #8 x 2-1/2” Wood Screws. Make sure that Picket is flush at the top and bottom.
(fig. 41.1)
411
S3
S3
S3
S3
392
411
343
2-1/2”
395
396
87
Содержание Cedar Summit Adventure Ridge Playset
Страница 128: ...NOTES 128...