Step 39: Assemble Tunnel Entrance & Safety Rail
Part 1
Hardware
Wood Parts
2 x
Tunnel Post 1-3/8 x 3-3/8 x 33”
1 x
Tunnel Arch 1-1/4 x 5 x 19-5/8”
1 x Tunnel Top 1-1/4 x 4 x 19-5/8”
2 x Safety Rail 1-3/8 x 4-1/2 x 18-3/4”
1 x Tennon Dowel 1-1/8 x 15-7/8”
8 x
#8 x 3” Wood Screw
2 x
1/4 x 3-1/2” Hex Bolt
(1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
391
393
392
S4
Fig. 39.2
Fig. 39.1
Fig. 39.3
341
S4
394
341
H13
392
392
341
394
394
S4
S4
S4
S4
H13
1/4” T-Nut
1/4” Lock
Washer
1/4” Flat
Washer
1/4” Lock
Washer
1/4” Flat
Washer
Flush
Flush
Pre-drill all pilot holes using a 1/8” (3.2 mm) drill bit before installing Wood Screws.
A:
Attach (391) Tunnel Top to (392) Tunnel Post with 2 (H13) Hex Bolts (with lock washer, flat washer and t-nut)
and 2 (S4) Wood Screws. (Fig. 39.1)
B:
Attach (393) Tunnel Arch to (392) Tunnel Post with 4 (S4) Wood Screws. (Fig. 39.1)
C:
Attach (341) Tennon Dowel to (394) Safety Rails with (S4) Wood Screws. (Fig. 39.2 and 39.3)
391
393
84
Содержание Cedar Summit Adventure Ridge Playset
Страница 128: ...NOTES 128...