2 Performance Verification
12
Model N6705 Service Guide
Verification Test Set-up
The following figures show the verification test set-ups. Connect all leads
to the Output terminals as shown in the following figures. Twist the + and
- load leads to reduce noise and inductance.
A.
Electronic load,
fixed resistor,
or N6784A in
CC load mode
DC voltmeter,
scope, or
rms voltmeter
+
+
+
B.
Differential
amplifier
Scope or
rms voltmeter
Current
shunt
+
DC
voltmeter
+
Electronic load
or resistor
50
50
output
50 ohm
termination
input
BNC
BNC
BNC
Install jumpers
from sense to
output terminals.
Enable 4-wire sense.
Press [Settings], then
select Advanced.
Select 4 wire.
Disable 4-wire sense.
LED indicator is off.
C.
+
−
1
+
−
2
AUX VOLTAGE
MEASUREMENT
+
External DC
power supply
+
DC
voltmeter
E.
Electronic load
+
+
DC
voltmeter
F.
Disable 4-wire
sense. LED
indicator is off.
RC network - for
N678xA transient
response test only.
+
D.
Keysight 3458A
configured as
an ammeter
Disable 4-wire
sense. LED
indicator is off.
External
DC supply
Current
monitor
+
+
G.
DC
voltmeter
+
Electronic
load or
resistor
Содержание N6705
Страница 1: ...Service Guide Keysight N6705 DC Power Analyzer ...
Страница 8: ......
Страница 104: ......
Страница 116: ......
Страница 120: ...6 Replaceable Parts 120 Model N6705 Service Guide Parts Location Diagrams Figure 6 1 External Parts ...
Страница 121: ...Replaceable Parts 6 Model N6705 Service Guide 121 Figure 6 2 Top Cover Removed ...
Страница 122: ...6 Replaceable Parts 122 Model N6705 Service Guide Figure 6 3 Top Chassis Removed ...
Страница 123: ...Replaceable Parts 6 Model N6705 Service Guide 123 Figure 6 4 Front Panel Figure 6 5 Handle Assembly ...
Страница 124: ......
Страница 132: ......