Site Requirements
Site requirements must be met before any type of electrical equipment can be installed at your
location. Site requirements include the following:
l
Rack Requirements
l
Ventilation Requirements
l
Environmental Requirements
l
Power Requirements
l
System Grounding Requirements
l
Fiber-Optic Connection Requirements
Review the following site requirements before proceeding with the installation and configuration of
BreakingPoint 20.
Rack Requirements
The BreakingPoint 20 chassis should be installed in a standard 19 inch EIA rack cabinet. We do not
recommend use of an equipment rack with side panels installed because of the horizontal airflow
requirements of BreakingPoint 20.
If the weight of the equipment on the rack is not evenly distributed, there is a chance that the rack
may tip over. Therefore, the rack needs to be properly anchored to an unmovable support system to
prevent it from tipping over.
Load the rack from the bottom up, filling the lower racks with the heaviest components and the higher
racks with the lightest components. This stabilizes the rack by evenly distributing the weight of the
equipment on the rack.
The vertical spacing on the rack rails must meet the standard EIA-310C spacing requirements of 1 inch
(2.54 cm). For more information on EIA-310C regulations, see
.
– 27 –
Содержание ixia BreakingPoint 20
Страница 1: ...BreakingPoint 20 Installation Guide ...
Страница 31: ...This page intentionally left blank 26 ...
Страница 41: ...This page intentionally left blank 36 ...
Страница 51: ...This page intentionally left blank 46 ...
Страница 66: ...Ixia a Keysight Business 26601 West Agoura Road Calabasas California 91302 Keysight Technologies 2005 2018 ...