Keysight N5290/1A Installation Guide 3-23
System Installation
Running the Installation Calibration
Running the Installation Calibration
1.
On the PNA, verify your N5290/1A system is in the correct configuration:
Press
Setup
>
External Hardware
>
Millimeter Config
.
2.
The Millimeter Configuration window that opens should have N5290A
Broadband or N5291A Broadband highlighted.
Else, press N5290A Broadband or N5291A Broadband. Refer to
Figure 3-19
Millimeter Configuration Window
This installation calibration should be ran when you first install your
system and whenever you make any changes to your system’s
configuration. See also
“Troubleshooting the N5293/5A Millimeter
.