104
90000 A-Series Service Guide
5
Replacing Assemblies
2
Perform a service calibration after the warm-up period:
a
Connect the RS-232 cable to the Digital Multimeter RS-232 port and to the
RS-232 port on the oscilloscope.
b
Set the Digital Multimeter as follows:
c
Click
Utilities > Calibration
.
d
Uncheck the Cal Memory Protect box to allow calibration.
e
Click
Start
to start the calibration procedure.
f
Follow the on-screen instructions as calibration proceeds.
Interface: RS-232
Baud Rate: 9600 Baud
Parity: None: 8 bits
Language: SCPI
Содержание Infiniium 90000A Series
Страница 1: ...Keysight Infiniium 90000 A Series Oscilloscopes Service Guide...
Страница 6: ...6 90000 A Series Oscilloscopes Service Guide...
Страница 12: ...12 90000 A Series Service Guide 1 General Information...
Страница 18: ...18 90000 A Series Service Guide 2 Calibration...
Страница 110: ...110 90000 A Series Service Guide 5 Replacing Assemblies P owerharness between backplaneand m otherboard O n O ff ca ble...
Страница 116: ...116 90000 A Series Service Guide 5 Replacing Assemblies...
Страница 119: ...Replaceable Parts 6 90000 A Series Service Guide 119 Exploded Views Front Frame and Front Panel...
Страница 120: ...120 90000 A Series Service Guide 6 Replaceable Parts Fan and Acquisition Assembly...
Страница 121: ...Replaceable Parts 6 90000 A Series Service Guide 121 Power Supply and PC Motherboard...
Страница 122: ...122 90000 A Series Service Guide 6 Replaceable Parts Sleeve and Accessory Pouch...
Страница 128: ...128 90000 A Series Service Guide 7 Theory of Operation Oscilloscope block diagram...
Страница 135: ......