Keysight B2900 User’s Guide, Edition 5
3-25
Installation
Installing the Interlock Circuit
•
25-pin D-sub connector (for wiring, mounted on the shielding box), 1 ea.
•
Connection wire
•
25-pin D-sub cable, 1 ea.
Procedure
1. Mount two mechanical switches onto your shielding box, so that the switches
close when the access door is closed, and open when the door is opened. See
for the switch dimensions.
2. Mount an LED onto your shielding box. See
for the LED
dimensions.
The LED is used as a high voltage indicator which is lit when B2900 is in the
high voltage output status.
3. Mount a D-sub connector onto your shielding box.
4. Use a wire and short the following pins of the D-sub connector. See
for a connection example.
For the negative logic: Pins 24 and 25
For the positive logic: Pins 16 and 17
5. Use a wire and connect the two switches in series between the following pins of
the D-sub connector. See
for the Digital I/O pin assignment.
For the negative logic: Pins 16 and some ground pins
The ground pins are pin numbers 15 and 17 to 21.
For the positive logic: Pins 24 and some +5 V pins
The +5 V pins are pin numbers 22, 23, and 25.
6. Use a wire and connect the LED between the pin 14 and some ground pins of the
D-sub connector. Then set the pin 14 to HIGH VOLTAGE LAMP. See
Configuration dialog box” on page 4-48
7. Connect a resistor between the pin 14 and an 5 V pin.
Содержание B2900 Series
Страница 1: ...Keysight Technologies B2900 Series Precision Source Measure Unit User s Guide...
Страница 3: ......
Страница 25: ...1 Getting Started...
Страница 41: ...2 Introduction...
Страница 64: ...2 24 Keysight B2900 User s Guide Edition 5 Introduction Options...
Страница 65: ...3 Installation...
Страница 101: ...4 Front Panel Reference...
Страница 155: ...5 Front Panel Operations...
Страница 189: ...6 Function Details...
Страница 233: ......