Programming
3215.72-01i01 Rev. A
P a g e
|
26
7.1.1
Assembly and start-up of the Connect Box
If the KuLi is connected to the PC/laptop and the connect box in the extended
state and this connection gets disconnected when the supply voltage is
switched on, the KuLi moves to the inner reference point.
The following cables are required to connect the Connect-Box:
(1)
Connection cable SPS
5 pol. M12-plug
(2)
Connection cable KuLi
5 pol. M12-connector
(3)
USB-connection
Type B
The Connect-Box is linked via the connection cables with 5-
pin M12 plugs. Pin assignment see Chap. 5.2.
1.
Disconnect the connection cable (1) to the PLC at
the KuLi and connect it to the Connect-Box. 2.
2.
Connect the second connection cable (2) from the
connect box to the KuLi. 3.
3.
The power supply and the interface signals for the
KuLi are passed through the connect box and
displayed via the LEDs on the connect box:
LED - S1
Plunger retracted/TXD PC software.
LED - SIGNAL IN
5-pin M12 socket/RXD PC software
LED - S2
Type B
4.
By plugging in the USB cable (3), the two
communication lines (Signal In and S1) are diverted
to the USB connection.
Содержание KuLi Series
Страница 44: ......