Installation
33 / 144
04/2017
3
Installation
Risk caused by toxic and hazardous vapours, gases and substances (e. g. bacteria, viruses). Always have any
necessary work on the backwater pumping station done by specialist staff (see 2.2).
3.1
General points related to installation
The backwater pumping station is installed and put into operation at different times according to the usual
construction phases on a building site.
3.2
Installation suggestion “black tub”
1 Ecolift
2 Sealing gasket set art. # 83 023 with counterflange and sealing sheet
3 Pipe duct sealing gasket
a Tiles
f Seal
b Screed
g Control unit
c Insulation
h Pressure pipe
d Concrete floor
e Protective concrete
BWS* Design flood
g
a
b
c
d
h
3
1
BWS*
e
f
2
Fig. [6]
Содержание Ecolift
Страница 22: ...22 144 DOP Leistungserkl rung 04 2017 6 DOP Leistungserkl rung...
Страница 23: ...DOP Leistungserkl rung 23 144 04 2017...
Страница 46: ...46 144 Declaration of performance 04 2017 6 Declaration of performance...
Страница 47: ...Declaration of performance 47 144 04 2017...
Страница 71: ...D claration de performance 71 144 04 2017 6 D claration de performance...
Страница 94: ...94 144 DoP Dichiarazionediprestazione 04 2017 6 DoP Dichiarazione di prestazione...
Страница 95: ...DoP Dichiarazionediprestazione 95 144 04 2017...
Страница 118: ...118 144 DOP vermogensverklaring 04 2017 6 DOP vermogensverklaring...
Страница 119: ...DOP vermogensverklaring 119 144 04 2017...
Страница 142: ...142 144 DOP Deklaracja w a ciwo ci u ytkowych 04 2017 6 DOP Deklaracja w a ciwo ci u ytkowych...
Страница 143: ...DOP Deklaracja w a ciwo ci u ytkowych 143 144 04 2017...