INSTRUCTIONS FOR INSTALLATION, OPERATION AND
MAINTENANCE
KESSEL Ecolift
Status 2017/04
Part no. 010-844
Installation Commissioning Instructional briefing
for the system was carried out by your specialist company:
Name/Signature Date City
For wastewater with and without
sewage
Functionality of backwater valve
and drainage pump
Safety of a lifting station
Simple installation in through
pipes
Plug & play control unit with display
and self-diagnosis system (SDS)
with integrated battery back-up
Motor-driven locking of the
backwater flap
Integrated drain function
for surface water drainage
Product advantages
Stamp of specialist company
Subject
to
technical
modifications
85101 Lenting
Z-53.2-487
Ecolift for
underground
installation
Ecolift for installation
above ground
mit Si
cherh
eit
geprü
fte Qu
alität
Bauart
geprüft
und überwacht
Bauart
geprüft
und überwacht
LGA
Landesgewerbeamt Bayern
mit Si
cherh
eit
geprü
fte Qu
alität
Bauart
geprüft
und überwacht
Bauart
geprüft
und überwacht
LGA
Landesgewerbeamt Bayern
Содержание Ecolift
Страница 22: ...22 144 DOP Leistungserkl rung 04 2017 6 DOP Leistungserkl rung...
Страница 23: ...DOP Leistungserkl rung 23 144 04 2017...
Страница 46: ...46 144 Declaration of performance 04 2017 6 Declaration of performance...
Страница 47: ...Declaration of performance 47 144 04 2017...
Страница 71: ...D claration de performance 71 144 04 2017 6 D claration de performance...
Страница 94: ...94 144 DoP Dichiarazionediprestazione 04 2017 6 DoP Dichiarazione di prestazione...
Страница 95: ...DoP Dichiarazionediprestazione 95 144 04 2017...
Страница 118: ...118 144 DOP vermogensverklaring 04 2017 6 DOP vermogensverklaring...
Страница 119: ...DOP vermogensverklaring 119 144 04 2017...
Страница 142: ...142 144 DOP Deklaracja w a ciwo ci u ytkowych 04 2017 6 DOP Deklaracja w a ciwo ci u ytkowych...
Страница 143: ...DOP Deklaracja w a ciwo ci u ytkowych 143 144 04 2017...