38 / 144
Installation
04/2017
3.9
Connecting the venting pipe (optional)
The venting pipe (optional) must be routed in such a way that it
does not hinder access for maintenance purposes nor the other
pipe connections (pressure pipe / cable conduit pipe).
- Screw the venting valve <11> out of the pump unit
<20>.
- Fix the vent pipe to the connection <12> on the venting valve
and route it through the drain body above the sealing
level.
3.10 Preparing the connection of the pressure pipe
- Remove the sealing plug <21> on the drain body <1>.
- Insert sealing gasket <24>
- Fit the connecting piece <22> from the inside of the tank on
the extension section <1> and tighten the nut <23>
using approx. 10 Nm.
- Connect the on-site pressure pipe to the connecting piece.
11
20
12
Fig. [15]
1
22
23
21
24
Fig. [16]
Содержание Ecolift
Страница 22: ...22 144 DOP Leistungserkl rung 04 2017 6 DOP Leistungserkl rung...
Страница 23: ...DOP Leistungserkl rung 23 144 04 2017...
Страница 46: ...46 144 Declaration of performance 04 2017 6 Declaration of performance...
Страница 47: ...Declaration of performance 47 144 04 2017...
Страница 71: ...D claration de performance 71 144 04 2017 6 D claration de performance...
Страница 94: ...94 144 DoP Dichiarazionediprestazione 04 2017 6 DoP Dichiarazione di prestazione...
Страница 95: ...DoP Dichiarazionediprestazione 95 144 04 2017...
Страница 118: ...118 144 DOP vermogensverklaring 04 2017 6 DOP vermogensverklaring...
Страница 119: ...DOP vermogensverklaring 119 144 04 2017...
Страница 142: ...142 144 DOP Deklaracja w a ciwo ci u ytkowych 04 2017 6 DOP Deklaracja w a ciwo ci u ytkowych...
Страница 143: ...DOP Deklaracja w a ciwo ci u ytkowych 143 144 04 2017...