Maintenance
43 / 144
04/2017
12.9
Check that the insert flap housings and flaps are fitted correctly
13
Block the pressure pipe and empty it
14
Lift out and clean the pump.
14.1
Make sure the pump is not damaged in any way.
14.2
Replace the pump flange sealing gasket
14.3
Clean the tank via the pump flange, clean the ventilation bore on the pump flange
15
Install the pump again. Tightening torques of the screws: 7 Nm
16
Clean and check the backwater flap, replace sealing gasket, backwater flaps
17
Replace the manual closure for the pressure pipe (locking lever)
18
Pressure pipe: Visual inspection of the pressure pipe
19
Remove the probes and clean with water
20
Probe
- Test and clean the electric probe
- Remove the screws, pull the probe out of the cover
- Immerse the probe in water
- The flap must close, the optical and acoustic warning device must respond
- Push the probe into the cover, screw in place
21
Check the ventilation pipe to make sure it is routed via the roof and clear
22
Switch the device on again
23
Carry out the function test following steps 1-4
24
Read out the log book via USB port
25
For installation in the concrete slab close the cover again
26
Battery voltage control unit
➞
Section 1.5.2 Voltage
27
Confirm maintenance date / set new date
➞
2.5 Maintenance completed
28
Operating cycles
Pump 1: ___________
Pump 2: ___________
Actuator valve: __________
Motor: _____________
The manufacturer or his representative (e.g. Factory Customer Service) confirms the above data from page 1 and 2 of this
protocol by means of their signature.
Resources used:
❑
Tripod
❑
Gas monitor
Material used:
❑
Seal set
❑
––––––––––––––––––––
❑
––––––––––––––––––––
System ready for operation and handed over to the customer:
.......................................................................... ..............................................................................................
Factory Customer Service/Technical Expert Stamp Town, date
....................................................................
..............................................................................................
Signature KESSEL AG/Factory Customer Service
Name printed in capital letters/Signature of client
Additional information: Never carry out maintenance during a backwater phase.
Please note that the flaps must be open after the inspection has been completed.
Содержание Ecolift
Страница 22: ...22 144 DOP Leistungserkl rung 04 2017 6 DOP Leistungserkl rung...
Страница 23: ...DOP Leistungserkl rung 23 144 04 2017...
Страница 46: ...46 144 Declaration of performance 04 2017 6 Declaration of performance...
Страница 47: ...Declaration of performance 47 144 04 2017...
Страница 71: ...D claration de performance 71 144 04 2017 6 D claration de performance...
Страница 94: ...94 144 DoP Dichiarazionediprestazione 04 2017 6 DoP Dichiarazione di prestazione...
Страница 95: ...DoP Dichiarazionediprestazione 95 144 04 2017...
Страница 118: ...118 144 DOP vermogensverklaring 04 2017 6 DOP vermogensverklaring...
Страница 119: ...DOP vermogensverklaring 119 144 04 2017...
Страница 142: ...142 144 DOP Deklaracja w a ciwo ci u ytkowych 04 2017 6 DOP Deklaracja w a ciwo ci u ytkowych...
Страница 143: ...DOP Deklaracja w a ciwo ci u ytkowych 143 144 04 2017...